
Pick the system
Four ways to clear the span
We price the options against each other for your loads and freight, then design the one that wins.
- Tapered clear-span framesThe most economical choice for most warehouses.
- Roof trussesLight and stiff for long spans and heavy services.
- Arched and curved roofsCurved rafters or trusses for sports and assembly halls.
Why it pays
Open floor that earns its keep
- More usable floorNo interior columns to work around for racking, aircraft or courts.
- Checked for wind and snow up frontUplift, drift and ponding are designed in, not discovered on site.
- Capacity for the whole jobA large roof is a large steel package, and ours is 2,500 t a month.
- Tracked piece by pieceYour team sees every member in PEB Studio.
How we get there
From span study to shipped steel
- Span studyCompare frames, trusses and arches for weight and freight.
- Design for your Engineer of RecordCalculations and drawings ready for review and approval.
- Fabrication in sequencesThe roof is made in the order your crew erects it.
- Shipped by erection sequenceLong members split and packed for containers.
Specification
Long-Span Steel Structures at a glance
- Systems
- Tapered frames, trusses, space trusses or curved rafters, chosen by span and load
- Design checks
- Deflection, ponding, wind uplift, snow drift and stability under ASCE 7-22
- Code basis
- IBC as adopted locally, AISC 360 member design
- Connections
- Bolted end plates or splices sized for shipping and lifting
- Erection support
- Sequence and temporary bracing guidance on the erection drawings
- Records
- Mill certificates, weld and dimensional inspections, coating readings
Photo
Photo
PhotoWhere it goes
Buildings that live on open floor
Questions
Long-span questions from US buyers
How far can a steel roof span without columns?
It depends on the loads, roof pitch, eave height and deflection limits, and is settled in design, not promised in advance. Our engineers compare frame, truss and arch options for your building.
Which long-span system is the most economical?
For most warehouses, tapered clear-span frames. For very long spans, heavy services or curved roofs, trusses or arches often win. We price the options against each other.
Can you handle a very large roof?
Yes. Our plant fabricates 2,500 t of structural steel a month; the Long Son petrochemical complex covered more than 56,000 m² (about 600,000 sq ft).
Who erects the structure?
Your erection crew, as the US contractor. We supply erection drawings and answer field questions while the frame goes up.
More primary structure: Pre-Engineered Metal Buildings · Rigid Frame Systems · Built-Up Steel Columns · Built-Up Steel Rafters · Tapered Frames · Hot-Rolled Structural Members · Steel Trusses · Multi-Storey Steel Framing
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Long-Span Steel Structures
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.