Capacity for Aruba
Large Aruba projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Aruba is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
Matched to Aruba
What Aruba builds, and the steel we supply for it
High-rise hotels along Palm Beach and the west coast, energy and water plants, warehouses near Barcadera, shops, offices and solar canopies.
Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Energy and utility structures
Power plant buildings, substations and utility structures.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Aruba.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in Aruba.
See the steel →Commercial buildings
Shops, showrooms, offices and mixed-use blocks on light, fast steel frames.
See the steel →Solar and EV canopies
Solar carports and EV charging canopies built for Aruba sun and storms.
See the steel →Sports halls and arenas
Sports halls, stadium stands and covered courts under long-span roofs.
See the steel →Schools and community halls
Schools, classrooms and community halls, designed to the loads your engineer of record sets.
See the steel →
Shipping to Aruba
From our plant to Barcadera, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Barcadera takes about 45 days; your contractor clears the cargo and takes it to site.
For Aruban contractors
Why Aruban contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to Barcadera, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Aruba package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Aruba job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in Oranjestad, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF Barcadera
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Barcadera.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Aruban contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Designed for Aruba
Built for the wind, salt and ground of Aruba
We design to the code basis agreed for Aruba with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
ModerateSalt air
Very highEarthquake
Moderate
Caribbean hurricane and marine guides
The whole shelf
Every product and solution, available for Aruba
Anything in our catalog can ship to Barcadera: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
An invitation to Aruban contractors
You win the job and build it. We fabricate the steel.
Aruba’s trade wind carries salt to every site on the island. We design and coat for it with your engineer, fabricate in one accredited plant and ship to Barcadera. You win the hotel or the plant and build it; we fabricate.
- You, the Aruban contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Aruba
Questions from Aruban contractors
Buying steel for Aruba: the questions we hear
What coating suits steel in Aruba?
Most sites face extreme salt in the trade wind. We propose a paint system, hot-dip galvanizing or duplex for the ISO 12944 category your engineer sets, often CX on the coast.
Do you work with Dutch-speaking teams?
Our team works in English. Drawings and documents are in English with metric units first, and your team can bring a Dutch or Papiamento-speaking colleague to any call.
What does World Steel supply for a project in Aruba?
The steel structure: design or a design check to the code basis agreed for Aruba with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Aruba?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Barcadera. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Aruba. World Steel designs and fabricates to the code basis agreed for Aruba and the standards it references, in our own plant in Vietnam. We hold no Aruban approval, licence or registration and have no office or crew in Aruba. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Aruba
Contact World Steel · Aruba
Talk to us about steel for Aruba
WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.