Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Caribbean industrial estates · Dominican Republic

Steel buildings for Dominican Republic free zones and industrial parks

The Dominican Republic runs 94 free-zone parks with 843 companies and close to 200,000 direct jobs, making medical devices, cigars, textiles and electronics for export. Parks fill fast and tenants build in phases. We design factories and warehouses for your lot, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them FOB Vietnam or CIF Caucedo for the local contractor, our customer, to erect.

94free-zone parks in operation (2024)
843companies in the parks (2024)
2,500 ta month from our own plant
FOB · CIFthe two terms we offer
Las Américas Caucedo Santiago Haina–Nigua
Pins are approximate and placed by district.

Four parks and districts, one fabricator

Choose your park. Each one has its own steel guide.

Park facts come from public statistics and press reports, with the year. Space is leased from each park’s operator; we supply the steel building for the lot you hold.

01

Santo Domingo Este

Zona Franca Las Américas

A private free-zone park near the capital with close to a million m² of land, medical device and electronics tenants and full occupancy.

  • ≈1 M m² · of land, public reports
  • 100% · of built buildings occupied (2026)
  • 14,000 m² · new logistics building
02

Punta Caucedo, Boca Chica

Caucedo Economic Zone

DP World’s logistics and economic zone at the Port of Caucedo, with warehouses from 500 m² beside one of the Caribbean’s busiest ports.

  • 1.7 M TEU · handled at Caucedo in 2024
  • +39% · zone occupancy growth (2025)
  • 2003 · year operations began
03

Santiago de los Caballeros

Zona Franca Industrial de Santiago

The Cibao’s big free-zone park, founded in 1974, with about 90 companies in some 200 buildings and tobacco, textiles and medical tenants.

  • 1974 · year the park began
  • ≈200 · buildings, public reports
  • 20,000 · jobs reported in 2019
04

San Cristóbal

Haina–Nigua industrial district

The certified industrial district around the Port of Haina, with thousands of firms, free-zone parks and new logistics parks.

  • 2022 · district certified
  • 3,026 · companies, public reports
  • Haina · port next to the district

Sources: CNZFE statistics 2024 via Revista Mercado and El Dinero (2025), El Dinero (2019, 2020, 2026), DP World (2025), Diario Libre (2023), Site Selection (2019). Check lots and leases with each park’s operator.

Why Dominican contractors trust the package

Standards you can submit, shipping you can plan, quality you can inspect

Standards you can submit

Every building is designed to the code basis your engineer of record names, with the basis printed on sheet one of the calculations.

  • Dominican building regulations guide
  • AISC 360 and AWS D1.1 designed to
  • Mill certificates for every heat
  • Your engineer of record approves and seals

Shipping you can plan

About 45 days at sea from the Vietnamese port to Caucedo on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

  • FOB Vietnamese port or CIF Caucedo
  • Packed in erection order
  • Bundle lists by building and area
  • Tracked live in PEB Studio

Quality you can inspect

Inspection items and rates are agreed with you before cutting, and your inspector can watch online or visit the plant.

  • Inspection and test plan agreed per job
  • AWS-qualified welders
  • Coating readings recorded
  • Materials tested at ILAC labs

From our plant to your estate gate

Five legs from Vietnam to a Dominican free zone

Sailing time is the typical figure from the Vietnamese port and is confirmed at booking. Steel is packed in erection order, so the first bundles off the truck are the first members your crew needs.

  1. Our plantFabricated, coated and packed in erection order
  2. Vietnamese portAbout two hours by road from the plant
  3. At seaAbout 45 days to Caucedo, typical sailing
  4. Caucedo or HainaCleared by your broker on CIF terms
  5. Park gateBy road to Santo Domingo, Santiago or San Cristóbal

From our plant

Where every Dominican Republic estate building is made

Real World Steel photos from our plant in Vietnam. None is shown as a site in Dominican Republic.

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Dominican Republic estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings for Dominican free zones

Which Dominican parks do you supply?

Zona Franca Las Américas, the Caucedo Economic Zone, the Zona Franca Industrial de Santiago and the Haina–Nigua industrial district, plus any other free-zone park where you hold a lot.

On what terms do you ship to the Dominican Republic?

FOB at the Vietnamese port, where your forwarder takes over, or CIF Caucedo, where we book and insure the sailing. Clearance is handled by your broker.

How long does steel take to reach Caucedo?

About 45 days at sea from the Vietnamese port on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

Which code are the buildings designed to?

To the code basis your engineer of record names, commonly with AISC 360 and AWS D1.1 alongside Dominican regulations. Your engineer approves and seals the design.

Do you design for earthquakes and hurricanes?

Yes. Your engineer sets the seismic and wind basis; we design the frame, cladding fixings and connections to it.

Do you erect the buildings?

No. World Steel designs and fabricates the steel. The local contractor, our customer, erects it.

How much steel can you fabricate for one park?

Our own plant fabricates 2,500 t of structural steel a month, and we have delivered single jobs of up to 5,000 t.

Building in a Dominican free zone?

Send the lot, the use and your engineer’s code basis. We design the steel, fabricate it in our plant and ship it CIF Caucedo.