Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Trinidad and Tobago · Contact World Steel

Contact World Steel about structural steel for Trinidad and Tobago

Energy plants at Point Lisas, warehouses along the Churchill-Roosevelt Highway or public works in Tobago: talk to the team that designs and fabricates the steel in our own plant in Vietnam and ships it to Point Lisas or Port of Spain.

Port of Spain, Trinidad and Tobago

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Port of Spain. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from Trinidad and Tobago, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Port of Spain.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Trinidad and Tobago drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Trinbagonian contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Port of Spain.

    Contractor partnership

Send us a message from Trinidad and Tobago

Tell us about your Trinidad and Tobago project

A few lines are enough to start: the municipality or Tobago, and the nearest town, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Trinidad and Tobago

Trinbagonian contractors: you win the job, we fabricate the steel

Plants and pipe racks at Point Lisas, warehouses on the East-West Corridor, malls in Chaguanas, offices in Port of Spain and resorts in Tobago are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Port of Spain or Point Lisas and back your bid with drawings and live tracking.

  • Energy and petrochemical works at Point Lisas
  • Logistics along the East-West Corridor
  • Hotels and public buildings in Tobago
  • Shop and erection drawings included

Who reads your message

The team that answers Trinidad and Tobago

The same sales team answers contractors, owners and engineers in Trinidad and Tobago. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Trinidad and Tobago, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Port of Spain, and you follow every step in real time in PEB Studio.

  • Trinidad and Tobago

    Your project

    Shipped to Point Lisas, Port of Spain

    The contractor, our customer, erects the steel; the Trinbagonian engineer of record approves the drawings and files them. We have no office or crew in Trinidad and Tobago.

    Structural steel for Trinidad and Tobago
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the code basis set in Trinidad and Tobago in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Trinidad and Tobago. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Trinidad and Tobago?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Trinidad and Tobago Q&A

Questions contractors in Trinidad and Tobago ask first

Do you ship to Point Lisas or Port of Spain?

Either. Point Lisas suits plants and yards in central and south Trinidad, Port of Spain the capital and the east-west corridor. Steel for Tobago goes on from Port of Spain to Scarborough.

Can you work to an energy operator’s specification?

Yes. Send the specification with the bid documents. Our engineers read it before we quote, and we tell you which clauses we meet as written and which ones need a question to your client.

Does World Steel have an office in Trinidad and Tobago?

No. We answer Trinidad and Tobago projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Trinidad and Tobago: they win the job and build it, we design, detail and fabricate the steel and ship it to Port of Spain.

Who erects the steel and who files the permit in Trinidad and Tobago?

The contractor, our customer, erects the steel and runs the site. The Trinbagonian engineer or architect of record approves the drawings and files them for the permit. We design to the code basis set in Trinidad and Tobago with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the municipality or Tobago, and the nearest town, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Port of Spain.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Port of Spain.

Send the drawings or the municipality, size and use. We set the design basis with your engineer of record, design or detail the steel to the code basis set in Trinidad and Tobago, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Spain.