Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Corrosion protection · Duplex systems

Two defenses, each covering for the other

Galvanizing protects steel by corroding slowly in its place. Paint protects the zinc by keeping weather off it. Put them together and each extends the life of the other, which is why duplex systems are used on steel that faces salt spray, chemicals or animal housing. Our steel is galvanized by an outside galvanizer in Vietnam and then painted to the system your designer specifies.

The pair

Each layer covers the other

GalvanizingZinc bonded to the steel, inside and out. Sacrificial protection at every edge and corner.
PaintA barrier over the zinc, plus color. Slows the zinc’s own wear.

Why it pays

For the steel that suffers most

  • Belt and bracesZinc and paint protect each other.
  • Harshest exposuresSalt spray, chemicals, livestock.
  • Color on galvanizedNo dull grey where looks matter.
  • RecordedBoth layers in the data record.
Steel bundles stacked high on a packing frame awaiting loadingPhoto
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Coated members drying in rows on stands in the paint hallPhoto
Members drying in the World Steel paint hall in Vietnam after coating.

How it is done

Galvanize, prepare, paint

  1. FabricatedVent and drain holes for galvanizing.
  2. GalvanizedBy an outside galvanizer in Vietnam.
  3. Surface preparedFor paint adhesion.
  4. PaintedTo the coating schedule.

Specification

Duplex systems at a glance

GalvanizingHot-dip to ASTM A123 (members) and A153 (hardware), by an outside galvanizer in Vietnam
Surface preparationGalvanized surface prepared for paint as the coating system requires
PaintCoats per the coating schedule, from established coating manufacturers
ExposureFor the harshest ISO 12944 categories
ColorFinish color per your architect
RecordsGalvanizing and paint results in the Manufacturing Data Record

Questions

Duplex system questions

Why paint galvanized steel?

Paint keeps weather off the zinc, so the zinc lasts longer, and the zinc protects the steel wherever the paint is damaged. It also lets galvanized steel take a color.

Who does the galvanizing?

An outside galvanizer in Vietnam, to ASTM A123 for members and A153 for hardware. We prepare the steel with vent and drain holes and manage the schedule.

How long does a duplex system last?

Typically much longer than either layer alone, but the actual life depends on the exposure and maintenance. We do not promise a number of years; your designer sets the target.

Who applies the paint coats?

Our own painters, trained and certified by the paint manufacturer, after the galvanized steel comes back from the galvanizer. The coating products we use carry UL certification.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Duplex Systems

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of corrosion protection, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.