Three lanes
Panama, Suez and the Cape, drawn to the same scale
Each ribbon runs from our export port in Vietnam to Point Lisas, Trinidad, so the three can be compared leg by leg. Miles are measured along the waypoints and rounded; the carrier sets the actual track.
Panama Canal lane
~11,200 nmiEast across the North Pacific, through the canal at Panama, then into the Caribbean Sea. The usual lane for the western and central Caribbean.
Canal draft and slots can be limited in dry seasons, as in 2023, when Gatun Lake ran low.
Suez Canal lane
~11,000 nmiWest through the Malacca Strait and the Indian Ocean, up the Red Sea, through Suez and the Mediterranean, then across the Atlantic.
Taken only when the carrier runs it: many Asia services avoided the Red Sea from 2024 and went round the Cape instead.
Cape of Good Hope lane
~11,400 nmiSouth through the Sunda Strait, across the Indian Ocean, round the Cape of Good Hope and north-west up the Atlantic.
The long way round, used when a canal is closed to the service or when a heavy-lift ship is already sailing that way.
Miles by port
Nautical miles from Vietnam to five Caribbean gateways
Rounded to the nearest 100 nmi. The dot marks the shortest lane for each port; shortest is not always the lane a carrier runs.
| Port | Panama Canal | Suez Canal | Cape of Good Hope |
|---|---|---|---|
| KingstonJamaica | ~10,600 nmi | ~11,500 nmi | ~12,400 nmi |
| CaucedoDominican Republic | ~10,800 nmi | ~11,100 nmi | ~12,000 nmi |
| San JuanPuerto Rico | ~11,000 nmi | ~10,900 nmi | ~11,900 nmi |
| BridgetownBarbados | ~11,300 nmi | ~10,800 nmi | ~11,400 nmi |
| Point LisasTrinidad and Tobago | ~11,200 nmi | ~11,000 nmi | ~11,400 nmi |
The western ports sit close to the canal, so Panama is shortest. For the eastern islands the westbound lanes come close or shorter, because they enter from the Atlantic side.
Who decides
What sets the lane your containers take
The lane belongs to the carrier’s service. These are the things that move it, and how we plan around them.
The service you book
Each carrier runs fixed loops. The lane is the one its Asia to Caribbean service takes this season; we book the service that calls at or relays to your port.
Canal conditions
Panama draft and slot limits in dry spells, or Suez and Red Sea closures, move a whole service onto another lane. The carrier announces it; we tell you.
The relay hub
A box for a small island is relayed at a hub. Kingston and Caucedo sit close to the Panama lane; the eastern islands are close to the Atlantic approaches.
The cargo
Containers and flat racks follow the liner services. Very long or heavy members can go breakbulk on a project ship, whose lane depends on its other cargo.
The season
From 1 June to 30 November ships route round tropical storms. Miles change a little, ports can close for a while, and we plan the slot with that margin.
Your site date
We plan production backward from the date your site is ready to receive, so the lane never decides when your steel leaves the plant.
Export leg
Every lane starts at our plant in Vietnam
Route questions
What buyers ask about the sea route to the Caribbean
Which sea route does steel from Vietnam take to the Caribbean?
Usually the Panama lane: across the Pacific and through the Panama Canal. For the eastern islands the carrier may run a westbound service through Suez or round the Cape of Good Hope. The carrier sets the lane for each sailing; we tell you which one it is.
How far is it from Vietnam to the Caribbean by sea?
About 10,000 nautical miles from our export port to the Atlantic end of the Panama Canal, then a few hundred to over a thousand more to the island. The table on this page gives each lane to five reference ports.
Why do you give miles here and not a time for each lane?
Because sailings change with the carrier, the hub, the canal and the season, while miles are fixed. The overall voyage time from the Vietnamese port to your Caribbean port, on a typical sailing, is shown on our Caribbean shipping simulator. We plan the production slot backward from the date your site is ready.
Can I choose the Panama or the Suez route?
You choose the service when you hold the freight, and we can book a service that takes a given lane when we hold it. The lane itself belongs to the carrier’s loop.
Does the route change the packing?
No. Every unit is packed for a full ocean crossing on ISPM 15-stamped wood, so a change of lane never changes how the steel is blocked, strapped and protected.
Does World Steel unload or erect on the island?
No. World Steel supplies the steel structure and the export papers. The contractor, our customer, receives, unloads and erects it, and takes the drawings through approval with the engineer of record.
Distances measured between illustrative waypoints along great-circle legs, rounded. Not a routing, a schedule or a transit time; the carrier confirms the lane for each sailing.
More Caribbean logistics
Which lane reaches your island?
Send the drawings or the island, size and site date. We fabricate the steel in our plant in Vietnam at up to 2,500 metric tons a month, book the service that reaches your port and tell you the lane.