What the crane does to a building
Every crane load, designed in
These are the loads that make a crane building different. We take them straight from your crane supplier's data.
- Vertical wheel loadsMoving loads with impact
- Lateral thrustFrom trolley acceleration and braking
- Longitudinal forcesFrom bridge travel and stopping
- FatigueThousands of repeat cycles over the building life
Why it matters
Frame, runway and crane as one system
One model for frame and runway
Crane loads, frames and girders are designed together.
Detailed for fatigue
Runway welds and connections chosen for repeat loading.
Alignment you can set
Shim and adjustment details planned for runway alignment on site.
Heavy members, in-house
Deep built-up girders and stepped columns from our own beam lines.
How it is done
From the crane data sheet to the shipped runway
- Crane data inCapacity, span, wheel loads and duty from the crane supplier.
- Frame and runway designFor your Engineer of Record to review and approve.
- Girders and columns fabricatedFull-length welds on automatic lines.
- InspectedNDT on critical welds as the inspection plan requires.
Specification
Crane building scope
- Configurations
- Column brackets, stepped columns or separate crane columns
- Runway girders
- Built-up or rolled girders with cap channels where needed
- Design basis
- AISC 360, with AISC Design Guide 7 practice for industrial buildings and crane runways
- Crane data
- Capacity, span, wheel loads and duty class from your crane supplier
- Fatigue
- Fatigue-sensitive welds detailed and inspected per the design
- Tolerances
- Runway alignment tolerances shown on the shop drawings
Photo
Photo
Photo
Photo
Photo
Made in our own plant
IAS AC472-accredited, 2,500 t of steel a month
Where it goes
Buildings that run on a crane
Questions
Crane building questions
What crane information do you need?
Crane capacity, span, hook height, wheel loads and spacing, and the duty class, usually from the crane supplier’s data sheet.
Do you supply the crane itself?
Yes, on request. World Steel can supply the overhead crane with the steel, designed to CMAA 70 or 74, so wheel loads and clearances are set in one design. If you buy the crane elsewhere, we design the runway to that supplier’s data. Installation, commissioning and the load test are site scope.
Brackets or stepped columns?
Brackets suit lighter cranes; stepped or separate crane columns suit heavier ones. Our engineers compare both for your crane data.
How do you handle fatigue?
Runway girders and connections are detailed for the crane’s duty, and fatigue-sensitive welds are inspected as your inspection plan requires.
More primary structure: Pre-Engineered Metal Buildings · Rigid Frame Systems · Built-Up Steel Columns · Built-Up Steel Rafters · Tapered Frames · Hot-Rolled Structural Members · Steel Trusses · Long-Span Steel Structures
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Crane Supporting Structures
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.