Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Jamaica · Kingston Harbour

Structural steel through the Port of Kingston

Kingston has one of the largest natural harbours in the Caribbean and two terminals that matter for steel: Kingston Freeport Terminal, a transshipment hub on the Asia and Panama services, and Kingston Wharves, a multipurpose terminal for breakbulk and cargo bound for Jamaica. Your steel can land here for a Jamaican site or be relayed onward to another island.

Pilot card · KingstonJM KIN
  1. SeaCaribbean SeaArriving from the Panama Canal, on the lane we give in nautical miles.
  2. CaysPort Royal and the PalisadoesThe long sand spit that shelters the harbour from the open sea.
  3. ChannelKingston Harbour channelInto one of the Caribbean’s largest natural harbours.
  4. KFTLKingston Freeport TerminalContainer berths for mainline ships and the feeders that relay their boxes.
  5. KWLKingston WharvesMultipurpose berths for breakbulk, RoRo and Jamaica-bound cargo.
Container berths
3, 2,400 m (7,870 ft)
Draft alongside
13.5 m (44 ft)
Container gantries
14
Breakbulk
Kingston Wharves

Hub and gateway

One harbour, two jobs: Jamaica’s gateway and a regional hub

Kingston Freeport Terminal is run by a subsidiary of CMA CGM under a 30-year concession from the Port Authority of Jamaica, signed in 2016. Most of its boxes are transshipment: they arrive on mainline ships through the Panama Canal and leave on feeders for ports across the Caribbean and Central America. That makes Kingston a common relay point for steel bound for smaller islands.

Steel for a Jamaican site is cleared at Kingston and trucked from the harbour. Kingston Wharves, a separate multipurpose terminal, takes breakbulk and RoRo with mobile harbour cranes, which suits members too long for a container.

Everything in your shipment is made in World Steel’s own plant in Vietnam and leaves Cai Mep or Cat Lai in containers or on flat racks, sealed at our plant and logged in PEB Studio.

Terminals

Kingston Freeport Terminal and Kingston Wharves, side by side

Figures from the Logistics Cluster port assessment (2016). Terminals change equipment and depths; the carrier confirms what applies to each call.

Containers and transshipment

Kingston Freeport Terminal

Operator
CMA CGM subsidiary
Berths
3, 2,400 m (7,870 ft)
Draft
13.5 m (44 ft)
Cranes
14 container gantries
Traffic
About 90 % transshipment
Multipurpose and breakbulk

Kingston Wharves

Operator
Kingston Wharves Limited
Berths
9, about 1,600 m (5,250 ft)
Draft
Up to 12.7 m (42 ft)
Cranes
Mobile harbour cranes
Cargo
Breakbulk, RoRo, containers
Anguilla Antigua and Barbuda Aruba The Bahamas Barbados Belize British Virgin Islands Cayman Islands Curaçao Dominica Dominican Republic Grenada Guyana Haiti Jamaica Montserrat Puerto Rico Saint Lucia Sint Maarten St Kitts and Nevis St Vincent and the Grenadines Suriname Trinidad and Tobago Turks and Caicos US Virgin Islands Panama Canal Caucedo, Dominican Republic Río Haina, Dominican Republic: steel delivery guide Puerto Plata, Dominican Republic: steel delivery guide Kingston, Jamaica Kingston Montego Bay, Jamaica: steel delivery guide Point Lisas, Trinidad and Tobago Port of Spain, Trinidad and Tobago: steel delivery guide Georgetown, Guyana: steel delivery guide Paramaribo, Suriname: steel delivery guide Bridgetown, Barbados: steel delivery guide Nassau, The Bahamas: steel delivery guide Freeport, The Bahamas: steel delivery guide San Juan, Puerto Rico: steel delivery guide Ponce, Puerto Rico: steel delivery guide Belize City, Belize: steel delivery guide Port-au-Prince, Haiti: steel delivery guide Cap-Haïtien, Haiti: steel delivery guide Willemstad, Curaçao: steel delivery guide Barcadera, Aruba: steel delivery guide George Town, Cayman Islands: steel delivery guide Castries, Saint Lucia: steel delivery guide Vieux Fort, Saint Lucia: steel delivery guide St John’s, Antigua and Barbuda: steel delivery guide St George’s, Grenada: steel delivery guide Kingstown, St Vincent and the Grenadines: steel delivery guide Roseau, Dominica: steel delivery guide Basseterre, St Kitts and Nevis: steel delivery guide Pointe Blanche, Sint Maarten: steel delivery guide St Thomas, US Virgin Islands: steel delivery guide St Croix, US Virgin Islands: steel delivery guide Road Town, British Virgin Islands: steel delivery guide Providenciales, Turks and Caicos: steel delivery guide Road Bay, Anguilla: steel delivery guide Little Bay, Montserrat: steel delivery guide

Sea lane

Vietnam to Kingston in nautical miles

Kingston is the closest of the large Caribbean hubs to the canal. An illustrative lane, measured between waypoints; the carrier sets the routing and we never quote it in days.

Our plant to Cai Mep or Cat LaiAbout 2 hours
Pacific to the Panama Canal~10,000 nmi
Canal to Kingston Harbour~530 nmi
Total sea lane~10,600 nmi

Receiving at Kingston

What to settle before the ship enters the harbour

Say if the box is for another island

If Kingston is only the relay, the bill of lading names the final port. Tell us early and we mark every unit for that port, not for Kingston.

Long members to the Wharves

Members that will not fit a flat rack can ship breakbulk to Kingston Wharves. We plan splices and the vessel with you before fabrication.

Papers to your broker first

Your broker lodges the declaration with Jamaica Customs using our invoice, packing lists, bill of lading and certificate of origin.

Jamaica guides that matter at this port

At our plant in Vietnam

Sealed at our plant, relayed through Kingston

Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Kingston questions

What buyers ask about steel through Kingston

Does steel for Jamaica land at Kingston Freeport Terminal or Kingston Wharves?

It depends on the vessel and the cargo. Containers on a mainline or feeder ship usually come through the Freeport terminal; breakbulk and long members suit Kingston Wharves. We name the terminal in the shipping plan.

Can Kingston be the hub for a job on another island?

Yes. Kingston is a transshipment hub, so a box for the Cayman Islands, Haiti or Belize can be relayed here onto a feeder under the same seal. The final port is named on the bill of lading.

What are the channel and berth depths at Kingston?

The Logistics Cluster assessment lists 13.5 m (44 ft) at the Freeport container berths and up to 12.7 m (42 ft) at Kingston Wharves. Deepening plans have been announced; the carrier confirms what applies to each call.

Does World Steel unload or erect in Jamaica?

No. World Steel supplies the steel structure. The contractor, our customer, receives, unloads and erects it, and takes the drawings through approval with the engineer of record.

Port facts as published by Logistics Cluster: Jamaica port assessment, checked November 2026. The carrier and terminal confirm what applies to each call.

More Caribbean ports and pages

Steel for Jamaica, or relayed through Kingston?

Send the drawings or the parish or island, size and site date. We design or detail the steel, fabricate it in our plant in Vietnam at up to 2,500 metric tons a month and ship it packed in erection order through Kingston.