The relay
Five stations, one seal
The box changes ships at the hub, not hands. It waits in the terminal’s transshipment yard, does not clear customs there and keeps the seal put on at our plant in Vietnam.
Sealed at our plant
World SteelPacked in erection order and sealed. The seal number goes on the packing list and the bill of lading.
Mainline ship
The carrierThe container sails on the large Asia service to the hub the carrier named in the booking.
Discharged at the hub
The hub terminalLifted off into the transshipment yard. It does not clear customs at the hub and the seal stays on.
Feeder ship
The carrier or its feeder partnerLoaded onto a smaller ship, often with its own cranes, for the island port.
Island port
Your importer and brokerDischarged at the final port, where your broker clears it with our papers.
Hub chart
Six relay points around the basin
Squares are hubs, circles the island ports they often feed. Networks change: the carrier names the hub for your box in the booking, and we put it on the papers.
- Kingston and Caucedo lie close to the Panama lane.
- Cartagena and Port of Spain reach the southern islands and the Guianas.
- Freeport serves the Bahamas, the Turks and Caicos and Bermuda.
The hubs
Each hub and the islands it often feeds
Click a port to open its page or, where it has none yet, its country’s steel delivery guide.
Kingston
Kingston Freeport Terminal, a CMA CGM subsidiary
One of the region’s largest relay ports, a short run from the Panama Canal. Most of its boxes are transshipment.
Caucedo
DP World Caucedo
A gateway for the Dominican market and a relay point toward Puerto Rico, the Virgin Islands and the Leeward Islands.
Freeport
Freeport Container Port, Grand Bahama
A relay point between the canal, the US East Coast and the northern Caribbean, close to the Bahamas and the Turks and Caicos.
Colón and Manzanillo
Atlantic-side terminals at the canal
Where many Asia services land boxes after the canal transit, for feeders to the western and southern Caribbean.
Cartagena
The terminals of Cartagena Bay
A large South Caribbean hub on the Asia and canal services, feeding the ABC islands, Trinidad and the Guianas.
Port of Spain
A regional relay for the southern islands
Feeders from Trinidad reach Grenada, St Vincent, Barbados and Saint Lucia, often on smaller geared ships.
Before you book
Six things to settle for a relayed box
A through bill of lading
Ask for one bill of lading from the Vietnam port to the island port, so the carrier answers for the whole relay.
The named hub
The booking should name the transshipment port, so you know where the box waits and whose yard holds it.
Flat racks on the feeder
Not every feeder takes flat racks or out-of-gauge loads. We check before long members are packed that way.
Feeder cranes
Small island ports may have no shore cranes. A geared feeder lifts the box with its own cranes.
Storm season
From 1 June to 30 November a hub or an island port can close for a while. Plan the slot with that margin.
Tracking across the relay
PEB Studio shows the box sealed and the mainline ship; the carrier’s tracking shows the hub and the feeder.
Transshipment questions
What buyers ask about relayed steel
What is transshipment in Caribbean shipping?
The container sails from Asia on a large ship to a hub such as Kingston, Caucedo or Cartagena, is lifted off there and carried on by a smaller feeder ship to the island port. It stays sealed and does not clear customs at the hub.
Which hub will my steel go through?
The one in the carrier’s network for your island. We name the hub in the booking and on the papers, so your broker and your team know where the box waits.
Is the container opened at the hub?
No. It is moved from ship to yard to feeder under the seal put on at our plant. The seal number is on the packing list and the bill of lading, and you can check it on arrival.
Can flat racks and long members be relayed to a small island?
Often, but not on every feeder. We check that the feeder takes flat racks or out-of-gauge loads before long members are packed that way, and can set splice points so the steel fits a standard container.
What if the island port has no cranes?
A geared feeder lifts the container or bundle with its own cranes. For very small piers we plan a barge or a landing craft with you and your contractor.
Who unloads the steel at the island port?
The contractor, our customer, with the port and the carrier. World Steel supplies the steel structure and the export papers; it does not unload or erect.
Hubs and operators as published by the terminals, checked November 2026. Which hub relays to which island changes with each carrier’s network; the booking names it.
More Caribbean logistics
Steel for a smaller island?
Send the drawings or the island, size and site date. We fabricate the steel in our plant in Vietnam at up to 2,500 metric tons a month, pack it for the relay and name the hub and the feeder in the plan.