Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Caribbean industrial estates · Aruba

Steel buildings for Aruba’s free zone and Barcadera parks

Aruba moved its cargo port to Barcadera in 2016, and the land around it is now the island’s industrial address: Free Zone Aruba’s new zone of about 40 ha in its first phase, and about 15 parcels on Aruba Ports Authority land for logistics and small-scale manufacturing. Tenants need warehouses, light industrial halls and showrooms. We design them for your lot, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them FOB Vietnam or CIF Barcadera for the local contractor, our customer, to erect.

2016Barcadera cargo port opened
≈40 hafree zone first phase
2,500 ta month from our own plant
FOB · CIFthe two terms we offer
Barcadera FZ Business Park Bushiri
Pins are approximate and placed by district.

Three sites, one fabricator

Choose your site. The Barcadera sites have their own steel guides.

Facts come from Free Zone Aruba, the Aruba Ports Authority, the Government of Aruba and press reports, with the year. Land is leased from FZA or APA; we supply the steel building for the lot you hold.

01

Barcadera, next to the cargo port

Barcadera Free Zone

Free Zone Aruba’s new zone beside the Barcadera cargo port, about 40 ha in its first phase, with land for industry, trade and showrooms.

  • ≈40 ha · first phase
  • 1996 · Free Zone Aruba founded
  • ≈3 km · from the airport
02

Barcadera harbour, Aruba Ports Authority land

Barcadera Business Park

About 10 ha of Aruba Ports Authority land by the Barcadera harbour, split into about 15 parcels for logistics, warehousing and small-scale manufacturing.

  • ≈15 · parcels on long lease
  • ≈10 ha · developable land (2023)
  • 440 m · quay at the harbour
03

Bushiri, Oranjestad

Bushiri free zone area

The older of Free Zone Aruba’s two designated areas, at Bushiri near Oranjestad.

  • FZA · one of two free zone areas

Sources: Free Zone Aruba website, Aruba Ports Authority Barcadera pages, Government of Aruba (2026), NoticiaCla (2023), Wikipedia (Barcadera). Check plots and leases with FZA or APA.

Why Aruban contractors trust the package

Standards you can submit, shipping you can plan, quality you can inspect

Standards you can submit

Every building is designed to the code basis your engineer of record names, with the basis on sheet one of the calculations for the building permit.

  • Aruba permits and codes guide
  • AISC 360 and AWS D1.1 designed to
  • Mill certificates for every heat
  • Your engineer of record approves and seals

Shipping you can plan

About 45 days at sea from the Vietnamese port to Barcadera on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

  • FOB Vietnamese port or CIF Barcadera
  • Packed in erection order
  • Bundle lists by building and area
  • Tracked live in PEB Studio

Quality you can inspect

Inspection items and rates are agreed with you before cutting, and your inspector can watch online or visit the plant.

  • Inspection and test plan agreed per job
  • AWS-qualified welders
  • Coating readings recorded
  • Materials tested at ILAC labs

From our plant to your estate gate

Five legs from Vietnam to a Barcadera lot

Sailing time is the typical figure from the Vietnamese port and is confirmed at booking. Steel is packed in erection order, so the first bundles off the truck are the first members your crew needs.

  1. Our plantFabricated, coated and packed in erection order
  2. Vietnamese portAbout two hours by road from the plant
  3. At seaAbout 45 days to Barcadera, typical sailing
  4. BarcaderaCleared by your broker on CIF terms
  5. Your lotNext to the port, or by road to Bushiri

From our plant

Where every Aruba estate building is made

Real World Steel photos from our plant in Vietnam. None is shown as a site in Aruba.

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Aruba estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings for Aruba’s free zone and parks

Which Aruban sites do you supply?

The Barcadera Free Zone, the Barcadera Business Park, the Bushiri free zone area and any other lot you hold on the island. We supply the steel building; FZA or the Aruba Ports Authority handles the lease.

On what terms do you ship to Aruba?

FOB at the Vietnamese port, where your forwarder takes over, or CIF Barcadera, where we book and insure the sailing. Clearance is handled by your broker.

How long does steel take to reach Barcadera?

About 45 days at sea from the Vietnamese port on a typical sailing, confirmed at booking. Our plant is about two hours by road from the port.

Which code are the buildings designed to?

To the code basis your engineer of record names for Aruba, commonly with AISC 360 and AWS D1.1. Your engineer approves and seals the design.

Do you design for Aruba’s wind?

Yes. Your engineer sets the wind basis; we design the frame, cladding fixings and doors to it.

Do you erect the buildings?

No. World Steel designs and fabricates the steel. The local contractor, our customer, erects it.

How much steel can you fabricate for one Aruba job?

Our own plant fabricates 2,500 t of structural steel a month, and we have delivered single jobs of up to 5,000 t.

Building at Barcadera?

Send the lot, the use and your engineer’s code basis. We design the steel, fabricate it in our plant and ship it CIF Barcadera.