Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Bermuda · Solutions and products

Steel solutions and products for Bermuda

Offices and hotels in Hamilton, airport buildings, warehouses and public works: here is every steel product and solution we supply for Bermuda, designed for Atlantic hurricanes and shipped to Hamilton.

Bermudian contractors, our whole range for the island is on this page, with one desk behind every item.

Supply docket
Ship to
Hamilton, Bermuda
Terms
FOB Vietnam or CIF Hamilton
At sea
About 45 days, port to port
Plant
2,500 t a month, IAS AC472
Design basis
The Bermuda Building Code
Drawings
Shop and erection, included
Tracking
Live in PEB Studio
Erection
By the Bermudian contractor

Capacity for Bermuda

Large Bermuda projects need a large plant. Ours fabricates 2,500 t a month.

These are single jobs from our own plant in Vietnam, released area by area. Whatever Bermuda is building, the steel comes from the same line.

For Bermudian contractors

Why Bermudian contractors work with World Steel

One supplier for the whole steel package, made in one accredited plant and shipped to Hamilton, with you in charge of the site.

  • Our own plant, 2,500 t a month

    One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Bermuda package gets a production slot, not a place in a queue.

  • IAS AC472 accredited

    The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.

  • One desk, one project manager

    Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Bermuda job.

  • Live in PEB Studio

    Follow every member from cutting to the ship in real time, from your office in Hamilton, and book cranes and crews on facts.

  • Shop drawings included

    Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.

  • FOB Vietnam or CIF Hamilton

    Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to Hamilton.

  • About 45 days at sea

    From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.

  • We never compete with you

    We supply the steel structure only. Bermudian contractors win and build the job; we back the bid with drawings, calculations and live tracking.

Designed for Bermuda

Built for the wind, salt and ground of Bermuda

We design to the Bermuda Building Code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.

The whole shelf

Every product and solution, available for Bermuda

Anything in our catalog can ship to Hamilton: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.

Structural steel and members

Frames, built-up members and multi-storey steel for buildings of any size.

Complete building packages

Whole buildings, frame to roof and wall cladding, packed as one shipment.

Solutions for island loads

Engineering groups written for hurricanes, earthquakes, salt air and remote sites.

Coating, quality and documents

What protects the steel and proves it: coatings, inspection, accreditation and sample files.

Shipping to Bermuda

From our plant to Hamilton, FOB or CIF

Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to Hamilton takes about 45 days; your contractor clears the cargo and takes it to site.

FOBVietnamYou or your forwarder book the ship from our port.
CIFHamiltonWe book sea freight and insurance to your port.

An invitation to Bermudian contractors

You win the job and build it. We fabricate the steel.

Bermuda builds to a high standard, and its contractors know it. We meet it with mill certificates by heat, an inspection plan agreed with you and drawings your engineer can approve quickly. You build; we fabricate.

  • You, the Bermudian contractorWin the job, clear the cargo, erect the steel and run the site.
  • World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
  • Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.

Questions from Bermudian contractors

Buying steel for Bermuda: the questions we hear

Bermuda is far out in the Atlantic. Can you still ship there?

Yes. We ship to Hamilton through the transshipment hubs that serve the island. CIF terms name Hamilton, and the voyage is confirmed at booking.

Do you design for Bermuda hurricane wind?

Yes. We take the wind speed and exposure your engineer of record sets under the Bermuda Building Code and size frames, cladding supports and connections to them.

What does World Steel supply for a project in Bermuda?

The steel structure: design or a design check to the Bermuda Building Code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.

How are price and delivery agreed for Bermuda?

Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to Hamilton. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.

How we work in Bermuda. World Steel designs and fabricates to the Bermuda Building Code and the standards it references, in our own plant in Vietnam. We hold no Bermudian approval, licence or registration and have no office or crew in Bermuda. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.

More for Bermuda

Contact World Steel · Bermuda

Talk to us about steel for Bermuda

WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.