Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Dominica · Contact World Steel

Contact World Steel about structural steel for Dominica

Resilient public buildings, airport works, warehouses and hotels: talk to the team that designs steel for Dominica’s hurricanes, rain and volcanic ground, fabricates it in our own plant in Vietnam and ships it to Roseau or Portsmouth.

Roseau, Dominica

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Roseau. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from Dominica, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Roseau.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Dominica drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Dominican contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Roseau.

    Contractor partnership

Send us a message from Dominica

Tell us about your Dominica project

A few lines are enough to start: the parish and the road access to the site, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Dominica

Dominican contractors: you win the job, we fabricate the steel

The new international airport, the geothermal plant in the Roseau valley, resilient housing, schools and clinics, eco-resorts and warehouses around Roseau are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Roseau and back your bid with drawings and live tracking.

  • Airport and terminal buildings
  • Resilient housing, schools and clinics
  • Eco-resorts and lodges
  • Shop and erection drawings included

Who reads your message

The team that answers Dominica

The same sales team answers contractors, owners and engineers in Dominica. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Dominica, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Roseau, and you follow every step in real time in PEB Studio.

  • Dominica

    Your project

    Shipped to Roseau

    The contractor, our customer, erects the steel; the Dominican engineer of record approves the drawings and files them. We have no office or crew in Dominica.

    Structural steel for Dominica
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Dominica building code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Dominica. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Dominica?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Before you write

Read up on steel for Dominica

Six guides and a page for every parish, written for Dominica: the code basis, the loads, the coatings and the road from Roseau.

Dominica Q&A

Questions contractors in Dominica ask first

Roseau or Portsmouth?

Woodbridge Bay at Roseau suits most of the island; Portsmouth can suit jobs in the north. Tell us the parish and we suggest the port and bundle lengths for the mountain roads.

Can you design to a climate-resilience programme’s brief?

Yes. Send the brief or the specification with the drawings. We design the steel to the loads your engineer of record sets and show them clearly in the calculations.

Does World Steel have an office in Dominica?

No. We answer Dominica projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Dominica: they win the job and build it, we design, detail and fabricate the steel and ship it to Roseau.

Who erects the steel and who files the permit in Dominica?

The contractor, our customer, erects the steel and runs the site. The Dominican engineer or architect of record approves the drawings and files them for the permit. We design to the Dominica building code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the parish and the road access to the site, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Roseau.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Roseau.

Send the drawings or the parish, size and use. We set the design basis with your engineer of record, design or detail the steel to the Dominica building code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Roseau.