A port built for the plants behind it
PLIPDECO, majority owned by the Government of Trinidad and Tobago, develops both the port and the industrial estate behind it. The port handles containers, breakbulk, steel, lumber and dry bulk across six general cargo and container berths, which makes it a natural landing point for the heavy, long members an energy-sector job needs.
Ships reach Point Lisas from the Caribbean Sea through the Dragon’s Mouth into the sheltered Gulf of Paria. Some services call directly; others relay boxes through a transshipment hub. We name the routing on each sailing.
Everything in your shipment is made in World Steel’s own plant in Vietnam: pipe racks, process structures, plate girders and complete buildings, coated for the salt and industrial air of the Gulf coast and packed in erection order.
Petrochemicals
Ammonia, urea and methanol plants: pipe racks, process platforms and compressor shelters.
Energy services
Workshops, yards and warehouses for the oil and gas service companies of the west coast.
Heavy industry
Steel and manufacturing plants with crane-served bays and long-span halls.
Logistics
Storage and distribution buildings for cargo landed at the port.
Port facts
Point Lisas port schedule
As published by PLIPDECO's port listings and trade press, checked November 2026. Depths vary by berth; the carrier confirms what applies to each call.
| Item | Value | Note |
|---|---|---|
| Channel | 12.5 to 13.7 m (41 to 45 ft) | SeaRates; Marinelink gives 12 to 14 m |
| Cargo pier | 11 to 12.2 m (36 to 40 ft) | Alongside the cargo berths |
| Berths | Six | General cargo and container |
| Cargo | Containers, breakbulk, steel | Plus lumber and dry bulk |
| Address | Orinoco Drive, Couva | Point Lisas Industrial Estate |
| Ownership | 51 % state, 49 % private | PLIPDECO |
Sea lane
Through the Dragon’s Mouth to Point Lisas
From the Panama Canal east along the South Caribbean, north of Aruba and Curaçao, then into the sheltered Gulf of Paria. An illustrative lane in nautical miles; the carrier sets the routing and we never quote it in days.
Pacific ~10,000 nmi
Caribbean ~1,170 nmi
Total ~11,200 nmi
Inland reach
From Point Lisas to the regions of Trinidad
Each region has its own page: towns, ground, weather, the road from the port and the steel we recommend.
Receiving at Point Lisas
Planning the landing around a running plant
Match the lot to the plant shutdown
For work inside a running plant, we plan each lot backward from the shutdown window, so steel lands on the estate when the permit to work opens.
Pipe racks ship as modules or as sticks
Tell us early whether your crew assembles on site or lifts pre-assembled frames. It decides whether we ship flat-rack modules or bundled members.
Papers to your broker first
Your broker lodges the declaration with Trinidad and Tobago Customs using our invoice, packing lists, bill of lading and certificate of origin.
Trinidad and Tobago guides that matter at this port
At our plant in Vietnam
Heavy members for the estate, made and packed in our plant
Point Lisas questions
What buyers ask about steel through Point Lisas
Should my Trinidad steel go to Point Lisas or Port of Spain?
Point Lisas suits sites on the industrial estate, central Trinidad and the south; Port of Spain suits the capital and the north. We quote the port with the shortest truck run on the sailing you choose.
Can pipe racks and long plate girders be landed at Point Lisas?
Yes. The port handles breakbulk and steel. Long members go on flat racks or as breakbulk, and we plan module sizes and splices with you before fabrication.
Do ships from Asia call at Point Lisas directly?
Some services do; others relay containers through a Caribbean hub onto a feeder. We name the routing on each sailing and give the lane in nautical miles.
Does World Steel erect on the estate?
No. World Steel designs, fabricates and ships the steel. The contractor, our customer, receives, unloads and erects it under the plant’s permit system.
Port facts as published by SeaRates: Point Lisas port and Caribbean Maritime: Trinidad and Tobago special report, checked November 2026.
More Caribbean ports and pages
Steel for a plant on the Point Lisas estate?
Send the drawings or the plot, size and shutdown window. We design or detail the steel, fabricate it in our plant in Vietnam at up to 2,500 metric tons a month and ship it packed in erection order to Point Lisas.