Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

US Virgin Islands · Contact World Steel

Contact World Steel about structural steel for the US Virgin Islands

Rebuilding, resorts and public works on St Thomas, St Croix or St John: talk to the team that designs steel for hurricanes and hillside ground, fabricates it in our own plant in Vietnam and ships it to Crown Bay or St Croix.

Charlotte Amalie, US Virgin Islands

Plant & engineering, Vietnam

Vietnam is 11 hours ahead of Charlotte Amalie. Tell us when you are free and we book calls inside your working day.

Steel shipped to

The US Virgin Islands

Simulate the voyage from our plant to St Thomas All solutions and products for the US Virgin Islands

2,500 t of structural steel a month from our own IAS AC472 plant in Vietnam

  • Email

    Drawings, questions and quote requests from the US Virgin Islands, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Charlotte Amalie.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your US Virgin Islands drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Virgin Islander contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to St Thomas.

    Contractor partnership

Send us a message from the US Virgin Islands

Tell us about your US Virgin Islands project

A few lines are enough to start: the island and the road access to the site, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · US Virgin Islands

Virgin Islands contractors: you win the job, we fabricate the steel

Hospitals and schools being rebuilt on St Thomas and St Croix, the airports, resorts and villas on all three islands, power and water plants and warehouses at the ports are large steel packages for small islands. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to St Thomas or St Croix and back your bid with drawings and live tracking.

  • Hospitals, schools and public buildings
  • Resorts and villas
  • Power, water and port buildings
  • Shop and erection drawings included

Who reads your message

The team that answers the US Virgin Islands

The same sales team answers contractors, owners and engineers in the US Virgin Islands. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in the US Virgin Islands, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to St Thomas, and you follow every step in real time in PEB Studio.

  • US Virgin Islands

    Your project

    Shipped to St Thomas, St Croix

    The contractor, our customer, erects the steel; the Virgin Islander engineer of record approves the drawings and files them. We have no office or crew in the US Virgin Islands.

    Structural steel for the US Virgin Islands
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Virgin Islands building code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for the US Virgin Islands. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from the US Virgin Islands?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Before you write

Read up on steel for the US Virgin Islands

Six guides and a page for every island, written for the US Virgin Islands: the code basis, the loads, the coatings and the road from St Thomas.

US Virgin Islands Q&A

Questions contractors in the US Virgin Islands ask first

Can you supply St John?

Yes. The steel lands on St Thomas and goes on to Enighed Pond by barge, booked by the contractor. We size bundles for it.

Can you work to a federally funded project’s specification?

Send the specification with the bid documents. Our engineers read it before we quote and tell you which clauses we meet as written and which ones need a question to the owner.

Does World Steel have an office in the US Virgin Islands?

No. We answer US Virgin Islands projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in the US Virgin Islands: they win the job and build it, we design, detail and fabricate the steel and ship it to St Thomas.

Who erects the steel and who files the permit in the US Virgin Islands?

The contractor, our customer, erects the steel and runs the site. The Virgin Islander engineer or architect of record approves the drawings and files them for the permit. We design to the Virgin Islands building code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the island and the road access to the site, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to St Thomas.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to St Thomas.

Send the drawings or the island, size and use. We set the design basis with your engineer of record, design or detail the steel to the Virgin Islands building code, and quote it made in our plant in Vietnam, packed in erection order and shipped to St Thomas.