Capacity for Puerto Rico
Large Puerto Rico projects need a large plant. Ours fabricates 2,500 t a month.
These are single jobs from our own plant in Vietnam, released area by area. Whatever Puerto Rico is building, the steel comes from the same line.
Already in the Caribbean
Steel from our plant stands in Guyana today:
- 18 pedestrian bridges
- 6 warehouses
- 2 maintenance workshops
- 1 office building
- 1 mosque
For Puerto Rican contractors
Why Puerto Rican contractors work with World Steel
One supplier for the whole steel package, made in one accredited plant and shipped to San Juan, with you in charge of the site.
Our own plant, 2,500 t a month
One plant in Vietnam fabricates 2,500 metric tons of structural steel a month, so a large Puerto Rico package gets a production slot, not a place in a queue.
IAS AC472 accredited
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year since 2019. Your inspector is welcome at every hold point.
One desk, one project manager
Design, drawings, steel, coating, inspection, packing and shipping under one contract, with one English-speaking project manager for your Puerto Rico job.
Live in PEB Studio
Follow every member from cutting to the ship in real time, from your office in San Juan, and book cranes and crews on facts.
Shop drawings included
Tekla shop and erection drawings come with every project at no extra cost, ready for your engineer of record to approve.
FOB Vietnam or CIF San Juan
Two clear terms: take the steel at our port in Vietnam, or let us arrange sea freight and insurance through to San Juan.
About 45 days at sea
From the Vietnamese port to the Caribbean port takes about 45 days, with packing lists and shipping documents ready for your customs broker.
We never compete with you
We supply the steel structure only. Puerto Rican contractors win and build the job; we back the bid with drawings, calculations and live tracking.
Matched to Puerto Rico
What Puerto Rico builds, and the steel we supply for it
Pharmaceutical and medical device plants, schools and hospitals being rebuilt, warehouses around San Juan, power and grid structures, and data rooms.
Plants with crane bays
Portal frames with crane bays for processing, packaging and manufacturing plants.
See the steel →Multi-storey hotels and offices
Multi-storey steel frames with composite deck for hotels, offices, apartments and hospitals.
See the steel →Warehouses and distribution
Clear-span distribution buildings with dock doors, mezzanines and racking loads, sized for the ports and estates of Puerto Rico.
See the steel →Energy and utility structures
Power plant buildings, substations and utility structures.
See the steel →Data center shells
Steel shells for data centers and telecom buildings, with heavy roof and equipment loads.
See the steel →Cold storage buildings
Insulated cold rooms and chilled warehouses for fish, produce and food distribution in Puerto Rico.
See the steel →Schools and community halls
Schools, classrooms and community halls, designed to the loads your engineer of record sets.
See the steel →Equipment shelters
Compact equipment and utility shelters, shipped ready to bolt together.
See the steel →
The whole shelf
Every product and solution, available for Puerto Rico
Anything in our catalog can ship to San Juan: structural steel and members, complete buildings, engineered solutions, and the coatings and quality records that go with them.
Structural steel and members
Frames, built-up members and multi-storey steel for buildings of any size.
Complete building packages
Whole buildings, frame to roof and wall cladding, packed as one shipment.
Solutions for island loads
Engineering groups written for hurricanes, earthquakes, salt air and remote sites.
Coating, quality and documents
What protects the steel and proves it: coatings, inspection, accreditation and sample files.
Designed for Puerto Rico
Built for the wind, salt and ground of Puerto Rico
We design to the Puerto Rico Building Code with the values your engineer of record sets, state them on sheet one and coat the steel for the exposure of your site.
Hurricane wind
Very highSalt air
Very highEarthquake
Very high
Caribbean hurricane and marine guides
Shipping to Puerto Rico
From our plant to San Juan, FOB or CIF
Members leave Vietnam piece-marked and bundled in erection order. The voyage from the Vietnamese port to San Juan takes about 45 days; your contractor clears the cargo and takes it to site.
An invitation to Puerto Rican contractors
You win the job and build it. We fabricate the steel.
Puerto Rico is rebuilding on a large scale, and Puerto Rican contractors are doing the work. We back you with steel designed with your engineer of record, made in one accredited plant and tracked member by member. You build; we fabricate.
- You, the Puerto Rican contractorWin the job, clear the cargo, erect the steel and run the site.
- World SteelDesign, drawings, fabrication, coating, inspection, packing and shipping.
- Your engineer of recordSets the loads, approves the drawings and seals them as local rules require.
- Start todayContact page for Puerto Rico
Questions from Puerto Rican contractors
Buying steel for Puerto Rico: the questions we hear
Do you design to the Puerto Rico Building Code?
We design to the Puerto Rico Building Code and the US standards it references, with the wind and seismic values your engineer of record sets. Your engineer approves and seals the drawings.
Can you ship to Ponce for southern Puerto Rico?
Yes. San Juan suits the north and the metro area; Ponce suits the south. CIF terms name the port you choose.
What does World Steel supply for a project in Puerto Rico?
The steel structure: design or a design check to the Puerto Rico Building Code with the loads your engineer of record sets, shop and erection drawings, fabricated and coated steel and bolts. Complete building packages add roof and wall cladding, doors and accessories, and overhead cranes can come with the building on request. The contractor, our customer, erects it.
How are price and delivery agreed for Puerto Rico?
Every quote is written for its project; we do not publish prices. You choose FOB Vietnam or CIF to San Juan. The voyage from the Vietnamese port to the Caribbean takes about 45 days, and the production slot is named in the quote.
How we work in Puerto Rico. World Steel designs and fabricates to the Puerto Rico Building Code and the standards it references, in our own plant in Vietnam. We hold no Puerto Rican approval, licence or registration and have no office or crew in Puerto Rico. The contractor, our customer, erects the steel and runs the site; the engineer or architect of record approves the drawings and seals and files them as local rules require.
More for Puerto Rico
Contact World Steel · Puerto Rico
Talk to us about steel for Puerto Rico
WhatsApp, email or a video call with our engineers, booked at an hour that suits San Juan. Our contact page for Puerto Rico has the ports, the local time and the form.