-
Email
Drawings, questions and quote requests from Suriname, read by our sales and engineering team.
dang.victor@worldsteelgroup.com -
Phone & WhatsApp
International calls reach our head office in Vietnam. Ask for a call at an hour that suits Paramaribo.
+84 902 881 833 WhatsApp +84 902 881 833 -
Video call
Walk through your Suriname drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.
Ask for a call -
Surinamese contractors
You win the job and build it; we design, detail and fabricate the steel and ship it to Paramaribo.
Contractor partnership
Send us a message from Suriname
Tell us about your Suriname project
A few lines are enough to start: the district and how the site is reached by road or river, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.
Contractor partnership · Suriname
Surinamese contractors: you win the job, we fabricate the steel
Shore bases and warehouses for the offshore oil projects, plants around Paramaribo, mine buildings in the interior, rice mills in Nickerie and public buildings in every district are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Paramaribo and back your bid with drawings and live tracking.
- Shore bases and plants for oil and gas
- Mine buildings in the interior
- Warehouses and plants around Paramaribo
- Shop and erection drawings included
Who reads your message
The team that answers Suriname
The same sales team answers contractors, owners and engineers in Suriname. Write through the form above or on WhatsApp and the right person picks up your message.
One team, two shores
Your site in Suriname, our plant in Vietnam
You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Paramaribo, and you follow every step in real time in PEB Studio.
-
Suriname
Your project
Shipped to Paramaribo
The contractor, our customer, erects the steel; the Surinamese engineer of record approves the drawings and files them. We have no office or crew in Suriname.
Structural steel for Suriname -
Vietnam
Head office & engineering
55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam
Design to the design basis set for Suriname in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.
+84 902 881 833 -
Vietnam
Plant, IAS AC472 accredited
Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam
Fabrication, QC, painting and export packing for Suriname. Visits and witnessed inspections by arrangement.
Tour the plant
Getting here
Flying in from Suriname?
Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.
- Tan Son Nhat Airport (SGN) Head officeDirections
- Head office Plant, Hai Son Industrial ParkDirections
Before you write
Read up on steel for Suriname
Six guides and a page for every district, written for Suriname: the code basis, the loads, the coatings and the road from Paramaribo.
Structural steel for Suriname→
- Building permits and codes→
- Soft clay and foundations→
- Rain, heat and flooding→
- Humidity and coatings→
- Port delivery: Paramaribo and rivers→
- Oil, gas and mining projects→
- 10 districts, one page each→
Suriname Q&A
Questions contractors in Suriname ask first
Can you supply a mining or oil and gas project in the interior?
Yes. We design and fabricate the steel, pack it for road or river transport from Paramaribo and mark each bundle for its building area. The contractor runs the transport and the erection on site.
Can I send drawings with notes in Dutch?
Yes, send the drawings as they are. Tell us in the form or on WhatsApp which sheets carry the key requirements and our engineers come back with their questions in English.
Does World Steel have an office in Suriname?
No. We answer Suriname projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Suriname: they win the job and build it, we design, detail and fabricate the steel and ship it to Paramaribo.
Who erects the steel and who files the permit in Suriname?
The contractor, our customer, erects the steel and runs the site. The Surinamese engineer or architect of record approves the drawings and files them for the permit. We design to the design basis set for Suriname with the loads they set and give them calculations, shop drawings and erection drawings to work from.
What should I send with my first message?
Tell us the district and how the site is reached by road or river, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Paramaribo.
Working in another country? Contact pages for all 26 Caribbean countries.
Made in Vietnam. Shipped to Paramaribo.
Send the drawings or the district, size and use. We set the design basis with your engineer of record, design or detail the steel to the design basis set for Suriname, and quote it made in our plant in Vietnam, packed in erection order and shipped to Paramaribo.