Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Belize · Contact World Steel

Contact World Steel about structural steel for Belize

Agro-industry sheds in the north, tourism buildings on the cayes or public works in Belmopan: talk to the team that designs steel for Belize hurricanes and soft coastal ground, fabricates it in our own plant in Vietnam and ships it to the Port of Belize or Big Creek.

Belmopan, Belize

Plant & engineering, Vietnam

Vietnam is 13 hours ahead of Belmopan. Tell us when you are free and we book calls inside your working day.

  • Email

    Drawings, questions and quote requests from Belize, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call at an hour that suits Belmopan.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through your Belize drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • Belizean contractors

    You win the job and build it; we design, detail and fabricate the steel and ship it to Belize City.

    Contractor partnership

Send us a message from Belize

Tell us about your Belize project

A few lines are enough to start: the district and whether the site is on the mainland or a caye, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Contractor partnership · Belize

Belizean contractors: you win the job, we fabricate the steel

Resorts on the cayes, warehouses in Belize City, agro plants in the north and south and public buildings across the country are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to the Port of Belize or Big Creek and back your bid with drawings and live tracking.

  • Resorts on the cayes and the coast
  • Logistics in Belize City
  • Agro plants in the north and south
  • Shop and erection drawings included

Who reads your message

The team that answers Belize

The same sales team answers contractors, owners and engineers in Belize. Write through the form above or on WhatsApp and the right person picks up your message.

Meet the full team

One team, two shores

Your site in Belize, our plant in Vietnam

You talk to World Steel by WhatsApp, email or video. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, shipped to Belize City, and you follow every step in real time in PEB Studio.

  • Belize

    Your project

    Shipped to Belize City

    The contractor, our customer, erects the steel; the Belizean engineer of record approves the drawings and files them. We have no office or crew in Belize.

    Structural steel for Belize
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to the Belize building code in SAP2000 and Tekla Structures, project management and PEB Studio. Our US office in Westminster, California, handles coordination.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing for Belize. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Flying in from Belize?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Before you write

Read up on steel for Belize

Six guides and a page for every district, written for Belize: the code basis, the loads, the coatings and the road from Belize City.

Belize Q&A

Questions contractors in Belize ask first

Belize City or Big Creek?

The Port of Belize suits the north, Belize City, Belmopan and the cayes; Big Creek can suit jobs in Stann Creek and Toledo. Tell us the district and we suggest the port.

Can steel go out to a caye?

Yes. The contractor takes it on by barge from the port. We keep bundle weights and lengths within what the barge and the site lifting equipment can handle.

Does World Steel have an office in Belize?

No. We answer Belize projects from our head office and plant in Vietnam and our US office in Westminster, California, by WhatsApp, email and video call. We work through contractors in Belize: they win the job and build it, we design, detail and fabricate the steel and ship it to Belize City.

Who erects the steel and who files the permit in Belize?

The contractor, our customer, erects the steel and runs the site. The Belizean engineer or architect of record approves the drawings and files them for the permit. We design to the Belize building code with the loads they set and give them calculations, shop drawings and erection drawings to work from.

What should I send with my first message?

Tell us the district and whether the site is on the mainland or a caye, what the building is for and a rough size in meters or feet, and attach any drawings you have. Files up to 50 MB each can go with the form. We do not publish prices: every quote is written for its project, with the scope of supply and the price FOB Vietnam or CIF to Belize City.

Working in another country? Contact pages for all 26 Caribbean countries.

Made in Vietnam. Shipped to Belize City.

Send the drawings or the district, size and use. We set the design basis with your engineer of record, design or detail the steel to the Belize building code, and quote it made in our plant in Vietnam, packed in erection order and shipped to Belize City.