Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Drainage & weather protection · Gutters

Every drop off the roof goes where you planned

A warehouse roof of 10,000 m² (107,600 sq ft) sheds tons of water in a single storm. Gutters gather it along the eaves and valleys and hand it to the downspouts. Too small, and water spills down the walls and into the foundations. We form gutters from coated steel to match the roof, sized from your local rainfall rates, and ship them with the building.

Roof slope draining into an eave gutter and down a downspout Roof runoff Gutter Downspout Wall line
IllustrationGutters sized from your local rainfall rates.

Gutter types

Three places a gutter can live

Eave gutter Along the low edge of the roof, outside the wall line.
Valley gutter Between two roofs that meet, inside the building line.
Box gutter Hidden behind a parapet for a clean roof edge.

Why it pays

Water off the walls, off the slab, out of the footings

  • Water managed

    Off the walls and foundations.

  • Sized for your rainfall

    From the local code rates.

  • Color-matched

    Same finish as the roof.

  • One package

    With trims and downspouts.

Specification

Gutters at a glance

Material
Formed coated steel, color-matched to the roof where available
Sizing
From the plumbing code rainfall rates (IPC or local), confirmed by your project engineer
Drainage
Roof drainage per IBC Chapter 15
Support
Hangers and straps at set spacing
Joints
Lapped and sealed, with end caps and outlets
Supply
With the roof package

How it works

From rainfall rate to roof package

  1. Rainfall rateFrom the code for your site.
  2. Gutters sizedPer roof area and slope.
  3. Shipped with the roofHangers, caps, outlets.

Questions

Gutter questions

Who sizes the gutters?

Gutter sizes come from the rainfall rates in the plumbing code for your site (IPC or local equivalent). Your project engineer confirms the sizes; we form and supply them.

Eave gutter or valley gutter?

Eave gutters sit outside the wall, so overflow goes outside. Valley gutters sit inside the building line and need overflow planning. Avoid valleys where you can.

Do gutters come in the roof color?

Where available, yes, formed from the same coated steel range as the roof.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Gutters

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of drainage & weather protection, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.