Support types
Three ways to hold a tray
Why it pays
Tray runs that never sag
Frame protected
Loads checked at every support.
Even spacing
As your engineer needs.
Faster electrical work
Supports ready on arrival.
Ships with the building
One package.
Specification
Cable tray supports at a glance
- Steel
- Trapeze frames, brackets and hanger steel
- Location
- On the building frame where the added loads are checked
- Inputs
- Tray size, fill and route from your electrical engineer
- Code
- Tray, cable and installation per the NEC (NFPA 70) as adopted locally
- Tray
- Listed tray products from others
- Installation
- Supports by your erector or electrical contractor; tray and cable by your electrician
How it works
Route in, supports out
- Tray routeSize, fill, path.
- Support points checkedIn the frame.
- Supports fabricatedTrapezes and brackets.
- Shipped markedBy route.
Questions
Cable tray support questions
Do you supply the tray?
No. Listed tray products come from others. We supply the steel supports.
What is the difference from cable support steel?
Cable tray supports are the standard trapezes and brackets for tray runs. Cable support steel covers larger frames, posts and crossovers for whole cable routes.
Who sets the spacing?
Your electrical engineer, from the tray manufacturer's data. We check the building frame at each point.
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Cable Tray Supports
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions

