Floor types
Open, closed or both
Why it pays
A floor that works with the equipment
Point loads handled
Framing under every machine foot.
Air and light through
Open grating ventilates.
Spills drain
Or are held, with plate.
Openings cut in
Pipes and cables pass through.
- Equipment listWeights, footprints and openings.
- Framing designedBeams and panel layout.
- Panels fabricatedCut, banded and coated.
- Shipped numberedPanels by layout mark.
Specification
Equipment floors at a glance
- Floor
- Steel grating panels or checker plate
- Framing
- Beams sized for the equipment and live loads
- Openings
- Cut and banded for pipes, ducts and cables
- Fixing
- Clips or welded to the framing, per design
- Finish
- Galvanized for wet or outdoor areas, painted for dry ones
- Guards
- Designed to the IBC or OSHA 1910 Subpart D, whichever applies
Photo
PhotoQuestions
Equipment floor questions
Grating or checker plate?
Grating where air, light and drainage help; plate where tools, liquids or fine materials must not drop through. Many floors use both.
How heavy can the equipment be?
The framing is designed for the actual equipment weights and footprints, with live loads from ASCE 7-22. Send the equipment list and we size it.
Can openings be added later?
Grating panels can be cut on site, but it is cleaner to cut and band them in the shop from the layout.
More mezzanines and floors: Steel Mezzanine Frames · Composite Floor Support Steel · Metal Decking · Steel Platforms · Access Walkways · Industrial Floor Support Structures · Stairs · Handrails
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Equipment Floors
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions