Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Welder beside a deep built-up girder running through the automatic linePhoto · World Steel beam line

Primary structural system · Built-up rafters

Roof beams that carry steel only where the bending needs it

A built-up rafter is welded from plate, so its depth can grow toward the knee and thin out toward the ridge, or follow a curve for an arched roof. You get a roof beam shaped by its loads, not by the nearest rolled size, with the haunch, splices and purlin clips welded on in our plant.

Profiles

Three shapes, one welding line

  • Straight taperedDeep at the haunch, slim at the ridge
  • PrismaticConstant depth where moments are even
  • CurvedArched rafters for curved roofs

Why built-up

Shaped by the loads, not by a catalog

  • Lighter roofs

    Depth follows the moment, so you are not buying a full-depth beam along the whole span.

  • Curved roofs without bending rolled beams

    Curved rafters are cut and welded to shape from plate.

  • Splices placed for shipping

    Splice locations follow container lengths and your erection plan.

  • Clips already on

    Purlin clips and brace tabs welded in the shop, in the right places.

On the beam line

Plate in, rafter out

  1. Flanges and webs cut to profileTapered and curved webs cut on CNC tables.
  2. Fit-up on the jigRafter assembled against its shop drawing.
  3. Welded on the beam lineAutomatic submerged-arc welds along the full length.
  4. Checked for camber and sweepDimensions recorded to AISC tolerances.
  5. Blasted and coatedCoating system chosen for the site.

Specification

Rafter data

Section
Welded I-section from plate, tapered, prismatic or curved
Welding
Flange-to-web by automatic submerged arc on our beam lines
Splices
Bolted end-plate splices sized for shipping lengths and erection
Fittings
Purlin clips, flange brace tabs and haunch stiffeners shop-welded
Design
AISC 360 member design, ASCE 7-22 roof loads including snow drift and uplift
Finish
Primed, painted or galvanized to the site exposure
Stiffened heavy plate girders resting on shop supportsPhoto
Curved long-span trusses being set during erectionPhoto
Members in gray finish paint laid out in the paint hallPhoto

Questions

Rafter questions from the bid table

Why taper a rafter?

Bending moment in a rafter is highest at the knee and lower toward the ridge. A tapered rafter puts depth where the moment is and saves steel elsewhere.

Can you make curved rafters?

Yes. Curved built-up rafters are cut and welded to profile from plate; World Steel has made them for export projects.

How long can a rafter piece be?

Rafters are split into bolted pieces sized for shipping and lifting. Splice positions are agreed in the shop drawings.

Do rafters come with purlin clips?

Yes. Purlin clips, flange brace tabs and stiffeners are welded on in the shop at the positions in your drawings.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Built-Up Steel Rafters

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Welder beside a deep built-up girder running through the automatic line Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.