Data hall column grid: fitting the steel to the rack layout

Columns are the one thing in a data hall that cannot be moved at the next refresh. The Data Center Handbook says to avoid them in small rooms, minimize them in medium ones, and coordinate them with the IT layout in large ones. Here is how to make the steel grid and the rack grid agree.

· updated November 23, 2026 · 5 min read · World Steel USA engineering team

The column grid is set once, at the start of design, and it stays for the life of the building. The IT layout, on the other hand, changes at every refresh. Chapter 23 of the Data Center Handbook edited by Hwaiyu Geng (2nd edition, Wiley, 2021), on rack floor plans and facility layout, is clear about the consequence: columns are a coordination challenge for the initial equipment layout and for every technology refresh that follows. A good data hall column grid is one the IT team rarely notices. This article explains the handbook's guidance and how to fit a steel frame to it.

Columns by room size

The handbook divides computer rooms by size for the purpose of discussion, noting the categories are not an industry standard:

Computer room Size used in the handbook Guidance on columns
Small Under 280 m² (3,000 ft²) Columns should be avoided
Medium Under 930 m² (10,000 ft²) May need columns; find solutions to avoid or minimize them
Large Above medium Will need columns or structural compartments; coordinate their locations with the IT designer to keep the space as open as possible
Very large 9,300 m² (100,000 ft²) or more Often built out in repeatable pods of compute, storage and network

For small and medium rooms, the answer is usually a clear-span frame. For large and very large rooms, the question is where the columns go, not whether.

The rack module

Chapter 23 gives an example of a repeatable layout: standard cabinets 800 mm (31 in) wide and 1.2 m (48 in) deep, in rows with 1.2 m (4 ft) hot and cold aisles. It also recommends:

  • a cold aisle of at least 1.2 m (4 ft);
  • a hot aisle of at least 900 mm (3 ft), with 1.2 m (4 ft) preferred;
  • a 1.2 m (4 ft) aisle between row ends and any cooling unit, which creates a perimeter aisle;
  • 1.8 m (6 ft) along at least one wall for moving large equipment;
  • at least 2.4 m (8 ft) from the corner of a cooling unit to the nearest perforated tile, where perimeter units and a raised floor are used.

With 1.2 m cabinets and 1.2 m aisles, a pair of rows, cold aisle between them and half a hot aisle on each side, repeats every 4.8 m. Along the rows, the module is the cabinet width.

The floor tile trap

The handbook points out a detail that catches international teams. In the United States, raised floor grids use 2 ft tiles, which are 609.6 mm square. Almost everywhere else, tiles are 600 mm square, which is 23.622 in. The two are not nominal equivalents. A 1.2 m metric module and a 4 ft US module drift apart by about 19 mm per module, which becomes significant over a long hall.

For the steel, the lesson is to set the column grid in the same system as the floor and the cabinets. A US data hall with a 2 ft tile grid should have column lines on multiples of the 2 ft module; a metric hall on multiples of 600 mm. World Steel drawings are produced in the system the project specifies, with metric first and US units alongside.

Where columns can go

Within a large hall, the aim is to put columns where they do the least harm:

  1. In the hot aisle, if it is wide enough, so the column does not block cold air delivery or cabinet access on the cold side.
  2. At row ends, in line with the perimeter aisle or with remote power panels, which the handbook recommends placing at the ends of rows.
  3. On compartment walls, where the hall is divided into rooms or pods anyway.
  4. Never in the cold aisle, where a column blocks airflow and service access.

A column grid that is a multiple of the 4.8 m pair-of-rows module can put every interior column line in a hot aisle. Along the rows, a spacing that is a multiple of cabinet width plus any row gaps keeps columns at row breaks.

Galleries and multistory layouts

Chapter 23 also describes ways to move non-IT systems out of the computer room, which simplifies the grid inside it. One is galleries: cooling and power equipment in corridors alongside the computer room, with fan walls blowing into the hall. The other is a multistory arrangement, with the computer room above or below the level that houses the mechanical and electrical plant. Both give the structural engineer more freedom: columns can sit in the gallery walls, and the hall between galleries can be a clear span. Our multi-story data centers guide explains the stacked option.

Steel options for the grid

Hall width Typical steel solution
Moderate Clear-span portal frames with tapered rafters, no interior columns
Wide Long-span trusses or open-web girders, still column free
Very wide Multi-span frames with interior column lines on the rack module, or galleries carrying the interior supports

Clear spans cost more steel per square meter as they get wider, and deeper roof members can reduce clear height. Multi-span frames are lighter but put columns in the hall. The right balance depends on the rack layout, the clear height and the roof plant. Our steel frame systems page shows the range, and data hall frames explains the data center version. Our article on ceiling height and clearances covers the vertical side of the same problem.

Repeat the grid, repeat the hall

For campuses, the grid is also the basis of repetition. A hall module with a fixed grid, fixed bay and fixed connections can be copied for every phase, which suits the pod approach the handbook describes for very large rooms. It also suits phased construction, where each hall is built when demand arrives. See our phased campus build-outs guide and the article on colocation and wholesale data center types.

Where World Steel fits

World Steel lays out data center frames around the rack module, aisle widths and floor grid the design team sets, choosing clear-span, long-span or multi-span solutions to suit. Fabrication of repeatable hall modules takes place in our own plant in Vietnam, with inspection accredited under IAS AC472, at a capacity of 2,500 metric tons (about 2,750 US tons) a month. Our customers are US contractors; site work, including erection, is their scope, and their Engineer of Record approves and seals the design. See the data center building package for the full shell scope.

Key takeaways

  • The handbook says to avoid columns in small computer rooms, minimize them in medium ones and coordinate them with IT in large ones.
  • Cabinet and aisle modules, such as 1.2 m cabinets with 1.2 m aisles, should drive the column grid.
  • US 2 ft tiles (609.6 mm) and metric 600 mm tiles are not interchangeable; set the grid in the floor's system.
  • Put columns in hot aisles, at row ends or on compartment walls, and use galleries or long spans to keep halls open.

Source: H. Geng (ed.), Data Center Handbook, 2nd ed., Wiley, 2021, Chapter 23. Ideas are paraphrased; grid examples are illustrative; consult your design team for project decisions.

Quick answers

Should a data hall have interior columns?

The Data Center Handbook says columns should be avoided in small computer rooms, minimized in medium ones, and, in large rooms where they are needed, located in coordination with the IT layout to keep the space as open as possible.

What module should the column grid follow?

The cabinet and aisle module: for example, 1.2 m deep cabinets with 1.2 m hot and cold aisles repeat every 4.8 m for a pair of rows. Grid lines that are multiples of that module keep columns out of the aisles that matter.

Why does the floor tile size matter?

US raised floors use 2 ft tiles of 609.6 mm, while metric floors use 600 mm tiles. The two are not interchangeable, so the column grid should be set in the system the floor will use.

Clear span or multi-span?

Clear span frames give a column-free hall up to their economic span; wider halls use long-span trusses or multi-span frames with interior columns placed on the rack module.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

Data center design series

Forty in-depth articles on planning, rating, laying out, cooling, powering, protecting and building a US data center, each read from the structural side: what the frame has to carry, where it sits on the schedule, and how World Steel designs and fabricates the steel for it in Vietnam.

Built on Hwaiyu Geng (ed.), Data Center Handbook, 2nd edition (Wiley, 2021), paraphrased and cited by chapter, with US codes and standards.

Rack AStrategy and planning

Sustainability, energy, data center types, edge sites and the cost picture.

Rack BRisk and resilience

Risk thinking, site search, Risk Category IV, performance-based seismic design and reuse of existing buildings.

Rack CNatural hazards

Wind, roof snow and rain, flood, lessons from Sandy and Tohoku, and post-event inspection.

Rack DStandards and ratings

TIA-942, Tier redundancy, ASHRAE thermal guidance, BICSI 002 and NFPA 75.

Rack EThe white space

Floor loads, ceiling height, column grid, raised floor and the overhead support steel.

Rack FCooling and air

Containment, economizers, liquid cooling, roof plant and the air the steel breathes.

Rack GPower and electrical

Generator yards, UPS and battery rooms, microgrids, grounding and electrical galleries.

Rack HBuild and operate

Project management, modular delivery, fire ratings, reliability and future growth.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.