Data centers buy reliability with redundancy: N + 1 generators, 2N power paths, A and B busway, spare cooling units. Chapter 29 of the Data Center Handbook edited by Hwaiyu Geng (2nd edition, Wiley, 2021) explains the engineering behind those choices, the field it calls "the science of failure." It also explains what can defeat redundancy: an event that takes out both paths at once. Some of those events are structural. Data center reliability engineering is usually a power and cooling exercise, but the frame that carries, shelters and supports that equipment belongs in the study too. This article explains the core ideas and where the steel enters.
Availability, reliability and maintainability
The handbook groups three attributes under the word dependability:
- Availability: readiness for correct service at a given moment;
- Reliability: continuity of correct service over a period;
- Maintainability: the ability to be modified and repaired.
It then defines the equipment data that feed every study: MTTF, the mean time to first failure; MDT, the mean down time, which includes detection, diagnosis, spare part delivery and repair; and MTBF, which is MTTF plus MDT. The point is practical: MTBF depends on how quickly a failure is found and fixed, so it depends on the site's maintenance organization, not only on the equipment.
Chapter 7 of the same handbook adds a warning about availability figures: the same percentage can come from one long outage or many short ones, with very different costs, which is why reliability is used in design to give a clearer picture.
The bathtub curve
The handbook describes the familiar failure-rate curve in three zones. In early life, failures come from latent faults, and factory burn-in and commissioning tests are meant to shrink this zone. In the useful life, failures are random and the rate is constant; reliability studies use this value. In wear-out, aging drives the rate sharply up, and components should be replaced before they reach it. It cautions against confusing an item's lifetime with its MTTF; they are different numbers.
The early-life zone has a structural counterpart. Fabrication and installation defects in steel, a missed weld, a wrong bolt, an anchor out of position, are latent faults too. Shop inspection, testing and the special inspection program are the structural equivalent of burn-in and commissioning.
Redundancy, and its limits
The handbook shows how redundancy changes reliability:
- Active redundancy: two units running together, either able to carry the load;
- Passive redundancy: one unit in standby, started when the first fails;
- Partial redundancy: a backup limited in time or capacity, such as batteries, fuel or water storage, which covers only failures shorter than its autonomy.
Its worked example is a simple power system: utility supply backed by a generator with 72 hours of fuel at full load, an automatic transfer switch, and a UPS with five minutes of battery. The dominant failure sequence, at around 80% of the total, is the generator failing during standby followed by a utility failure. That is a hidden failure: a standby function that fails silently and is discovered only when needed or when tested. Testing intervals therefore matter as much as equipment quality.
Common cause failures
The concept that matters most for the structure is the common cause failure: a single failure or condition that affects several devices that would otherwise be independent. The handbook calls it one of the most important points of a reliability study, because it can defeat two redundant devices at once. It classifies the causes in two groups:
- Human error, including errors during the design, manufacturing and installation phases, unintended actions, incorrect procedures, and inadequate training or maintenance;
- Environment, including fire and smoke; temperature, humidity and moisture; electromagnetic fields; animals; contamination and dust; and wind, flood, lightning, snow, ice and earthquake.
Read that list from the structural side and the frame appears everywhere. If A and B generators sit on one platform, the platform is a common cause. If redundant chillers share a roof, the roof framing is a common cause in a snow or wind event. If both busways hang from the same support steel, the supports are a common cause in an earthquake. And design or fabrication errors in the steel are exactly the human-error class the handbook describes.
Bringing the structure into the study
The handbook's methodology starts with a preliminary risk analysis that defines each undesired event, such as loss of critical load power for longer than a set time, and a target frequency for it. It then describes the system architecture, collects failure and maintenance data, analyzes failure sequences and identifies weak points. If a target is not met, the answer is better redundancy or better maintenance, while keeping the system technically possible, cost effective and simple to operate.
Structural questions fit naturally into that process:
| Reliability question | Structural response |
|---|---|
| Do redundant systems share a support? | Separate platforms, dunnage or support lines for A and B equipment where practical |
| Can one hazard reach both paths? | Design supports and roofs for the site's wind, snow, flood and seismic loads at the owner's risk category |
| Can a design or fabrication error be latent? | Independent design checks, shop inspection, material traceability and special inspection |
| Is a hidden structural fault found in time? | Periodic inspection of supports, anchors and coatings, especially outdoors |
| How fast can damage be repaired? | Record drawings and member traceability so replacement parts can be fabricated quickly |
The last row echoes the handbook's point about MDT. If a support is damaged, the downtime includes the time to identify the member, detail a replacement and fabricate it. Good records shorten that. Our quality records page and lifecycle maintenance guide explain how those records are kept, and our seismic data centers and equipment yards and platforms guides cover the hazards.
Keep it simple
Both Chapter 7 and Chapter 29 warn that complexity erodes the benefit of redundancy. A simple structural layout supports that aim: clear load paths, separate supports for redundant equipment, consistent details and accessible connections are easier to inspect, understand and repair than a tangle of shared frames. The article on data center risk management and the frame covers that side of the handbook.
Where World Steel fits
World Steel designs and fabricates frames, platforms, dunnage and support steel for data centers so that redundant equipment can be carried on separate, clearly defined load paths, designed for the hazard levels the owner sets. Fabrication is done in our own plant in Vietnam with inspection accredited under IAS AC472, and every member is traceable through shop records that support later repair. Our customers are US contractors; site work, including erection, is their scope, and their Engineer of Record approves and seals the design. See the data center building package for the full shell scope.
Key takeaways
- The handbook defines availability, reliability and maintainability, and shows that MTBF depends on downtime and maintenance.
- Redundancy raises reliability, but partial redundancy and hidden failures in standby equipment limit it.
- Common cause failures, including design and fabrication errors, wind, snow, flood and earthquake, can defeat redundant systems at once.
- Separate supports for A and B equipment, hazard-level design, inspection and good records bring the structure into the reliability study.
Source: H. Geng (ed.), Data Center Handbook, 2nd ed., Wiley, 2021, Chapters 7 and 29. Ideas are paraphrased; consult your Engineer of Record for project decisions.
Quick answers
What is the difference between availability and reliability?
The Data Center Handbook defines availability as readiness for correct service at a given time and reliability as continuity of correct service over a period. A system can show high availability yet suffer frequent short failures, which reliability captures better.
What is a common cause failure?
A single failure or condition that affects several devices that would otherwise be independent, such as both redundant paths. The handbook calls it one of the most important points of a reliability study, because it can defeat redundancy.
Why does the structure matter in a reliability study?
The handbook lists design and manufacturing errors, fire, wind, flood, snow, ice and earthquake among common cause failures. A roof collapse, a failed support or a toppled platform can take out redundant A and B systems at once.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Crane building designUS crane standards for mill and bay buildings
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors