The range
What each flashing does
- Eave trim
- Closes the low edge and drips water clear of the wall.
- Rake trim
- Wraps the gable edge against wind-driven rain.
- Valley
- Carries water where two roof planes meet.
- Transition
- Seals a roof slope change or a high-low roof.
- Wall flashing
- Where a roof meets a higher wall.
- Penetration
- Collar for pipes and ducts through the roof.
Why it matters
Edges are where roofs leak
Drawn, not improvised
Each flashing appears on the roof details.
Matching coil and color
Edges match the panels they close.
Laps that shed water
Upslope over downslope, sealed where needed.
Counted and labeled
Packed by roof area with closures and fasteners.
How it is made
Detailed, folded, bundled
- Roof detailsEdges and penetrations detailed on the drawings.
- Folded on the press brakeFrom matching coil to the detail shapes.
- Bundled by areaLabeled to match the erection drawings.
Photo
PhotoSpecification
Roof flashings at a glance
- Material
- Same coated and painted coil as the roof panels
- Range
- Eave, rake, valley, transition, wall and penetration flashings
- Detailing
- Every flashing shown on the roof details with laps and fasteners
- Sealing
- Closures, sealant tape and stitch screws included
- Lengths
- Standard lengths with laps, cut lists by roof area
- Custom
- Special shapes folded from your shop drawing details
Where it goes
Roofs with lots of edges
Questions
Roof flashing questions
Are flashings included with the roof?
Yes. Flashings, closures and sealants are listed with the roof panels in the same package.
Can you fold custom flashing shapes?
Yes. Send the detail or we draw it on the shop drawings, and we fold it from matching coil.
How are roof penetrations flashed?
With a collar or curb detail for the pipe or duct size, shown on the roof drawings. Large openings get framing from the steel package.
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Roof Flashings
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions