Profiles
Pick the rib for the roof
Profiles drawn as sections. The right one depends on slope, purlin spacing, wind and the look you want.
Deep ribs for longer purlin spans and low slopes.
Illustration: profile shapes are indicative; the profile for your roof is confirmed in your quote.
Why it pays
Panels that arrive ready for the roof
Formed to length
Fewer end laps means fewer places for water to get in and fewer pieces to lift.
One package with the frame
Panels, trims and fasteners ship with the steel they fix to.
Coated and painted at the mill
Metallic coating plus factory paint, chosen for your exposure.
Match walls and trims
Trims and wall sheets come from the same coil and color.
Specification
Metal Roof Panels, line by line
- Base steel
- Zinc or zinc-aluminum coated steel coil from mills in Vietnam
- Finish
- Factory paint system on the weather side; color and paint system in your quote
- Thickness
- In mm, with the US gauge in parentheses, sized for your purlin spacing and loads
- Length
- Roll-formed to the lengths in your roof layout to cut end laps
- Attachment
- Through-fastened with sealing-washer screws, or concealed clips for standing seam
- Loads
- Spans and uplift checked against ASCE 7-22 pressures and the panel’s published load data
Photo
Photo
Photo
Photo
Photo
Made in our own plant
IAS AC472-accredited, 2,500 t of steel a month
From coil to roof
Made in our plant, cut to your layout
- Coil checked inCoating and paint checked against the mill certificate.
- Roof layoutPanel lengths and laps taken from the approved drawings.
- Roll-formed in our plantProfiled and cut to length, bundled by roof area.
- Crated for the voyageProtected and labeled to match the erection drawings.
Questions
Roof panel questions
Which roof panel profile should I use?
It depends on the roof slope, purlin spacing, wind uplift and the look you want. Ribbed through-fastened panels suit sheds, shops and many warehouses; standing seam suits low slopes and long runs. We recommend a profile with your quote.
What thickness and coating do the panels have?
Thickness and coating weight are chosen for your loads and site exposure, then listed in millimeters (with the US gauge) in your quote. We do not publish one fixed table because every roof is sized for its job.
Can the panels be cut to the full length of the roof slope?
Usually yes. We roll-form to the lengths in your roof layout, limited by what fits in a shipping container and what your crew can handle on site.
Do you supply the screws and closures too?
Yes. Fasteners, closures, sealant and trims are listed in the same package so the roof can be finished without hunting for parts.
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Metal Roof Panels
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions