
What it carries
Equipment up high, floor free below
Why it pays
More plant in the same footprint
Floor space back
Equipment above, traffic below.
Sized for real loads
From your equipment data.
Safe access
Stairs and rails included.
Openings cut in
For pipes, ducts and cables.
Specification
Equipment platforms at a glance
| Framing | Beams, columns and bracing, designed to AISC 360 |
|---|---|
| Deck | Steel grating or checker plate |
| Access | Stairs, ladders and guardrails to the IBC or OSHA 1910 Subpart D |
| Inputs | Equipment weights, vibration data and openings from your process engineer |
| Welding | AWS D1.1 |
| Drawings | Modelled in Tekla Structures with your equipment layout |
How it works
Modelled around your equipment
- Equipment listWeights, footprints, openings.
- Platform modelledIn Tekla Structures.
- FabricatedFraming, grating and rails.
- Shipped markedReady to bolt up.
PhotoQuestions
Equipment platform questions
Who sets the equipment?
Your erector assembles the platform. Your equipment installer sets the units. We design and fabricate the steel.
Can you design for vibration?
Yes, from the vibration data your equipment supplier provides. We check the framing stiffness for the running equipment.
Indoor or outdoor?
Both. Outdoor platforms are usually galvanized, through an outside galvanizer in Vietnam.
More crane and industrial supports: Crane Runway Beams · Crane Supporting Columns · Maintenance Walkways · Machinery Support Frames · Loading Platforms · Industrial Access Systems · Overhead Cranes · Hoists
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Equipment Platforms
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides