Chapter 37 of the Data Center Handbook edited by Hwaiyu Geng (2nd edition, Wiley, 2021), co-written with Masatoshi Kajimoto, is about preparing data centers for natural disasters and pandemics. Its core is two case studies: the Great East Japan earthquake and tsunami of March 2011, and Superstorm Sandy on the US East Coast in October 2012. Read together with the resilience strategies in Chapter 27, they make a strong case that data center disaster recovery starts long before the disaster, and that the building is the first line of the plan. This article distills the lessons and adds the structural view.
The 2011 Great East Japan earthquake and tsunami
The handbook describes the event in scale: a magnitude 9.0 subduction earthquake off the Tohoku coast, the largest in Japan since instrumental records began, followed about thirty minutes later by a tsunami that struck some 650 km of coastline. It combined an earthquake, a tsunami, a nuclear plant shutdown and a global supply chain disruption. The handbook calls it the costliest natural disaster on record.
The chapter then traces what happened to businesses and their IT over time:
| Period | What organizations faced |
|---|---|
| First three days | Key decision makers lost, phone networks congested, power cut, vendors also hit, transport routes damaged, aftershocks continuing |
| First three months | Rotational blackouts, continuing power shortages, legal limits on electricity use around Tokyo |
| Four months and beyond | Severe power shortages in western Japan as nuclear plants stayed shut and companies migrated there |
For IT in particular, the handbook lists painful details. Fuel stocks for emergency power lasted only one or two days. Generators had been designed for short runs, not weeks. Electronic security on server rooms became an obstacle when power was unreliable, and some sites simply propped the doors open. Backup centers in the same region failed as well. Replacement servers were slow to arrive because so many organizations needed them at once. Diesel deliveries stopped because roads were not repaired quickly.
The lessons the handbook draws are broad: bad conditions can last a long time, so plan for slow recovery; train as many people as possible to respond, because fixed role lists break down; and use a risk management framework rather than a shelf of scenario manuals that lull an organization into false comfort.
Superstorm Sandy, 2012
Sandy made landfall in New Jersey and affected 24 states. The handbook records a storm surge of about 4.2 m (13.9 ft) at Battery Park in New York, a record for that gauge. Millions of customers lost power for days. The handbook highlights details that matter to data center operators: transit shut down, about two thirds of gas stations in metropolitan New York had no fuel for sale, and the Federal Communications Commission reported that about a quarter of cell towers lost power.
On buildings, the handbook's observation is precise. Most data centers built before Sandy had kept the computer room out of the basement and often above the first floor. But supporting gray space, with switchgear, chillers, pumps and UPS, had tended to move to lower levels. That was fine above grade and disastrous below it. Where codes forced fuel tanks into basements, flooding could float a tank off its foundation and break its connections.
The handbook's Sandy checklist covers planning, communications, power, logistics, maintenance, people and IT. Selected points:
- Planning. Invoke the continuity plan as soon as a storm warning is issued; plan for 48, 96 or 144 hours.
- Power. Keep at least 12 hours of on-site fuel as a minimum, test switchover regularly, and hold fuel contracts with suppliers in different locations.
- Testing. Run generators regularly for six to eight hours, perform pull-the-plug tests, and top off tanks before a storm.
- Communications. Diversify carriers, including satellite phones, because mobile networks fail.
- People. Pre-plan teams from unaffected sites who can arrive before roads and airports close.
What the structure has to deliver
Every one of these plans assumes something the IT team does not control: that the building is standing, dry, safe to enter and able to carry its plant. Chapter 27 is explicit that a code-minimum building is designed for life safety, not for continued operation. A building can be "life safe" and still be too damaged to use.
That is why the handbook recommends that owners set their own performance standards for each facility, deciding which buildings need only life safety, which need damage control and which must be usable immediately. For critical data centers, the structure should be designed to the higher standard. The handbook also notes that for data centers the structure is a small share of total cost, so added resilience costs little as a percentage. Our TCO and the structure article explores that point.
From the two disasters, the structural lessons are:
- Keep critical plant above the water. Gray space at grade or on upper levels, raised equipment yards and elevated fuel systems. See our flood and tsunami design article and the equipment yards and platforms guide.
- Design for continued function after shaking. Higher performance targets and braced nonstructural systems, as in our seismic data centers guide and the performance-based seismic design article.
- Protect the envelope and roof plant from wind. Cladding and rooftop equipment are where hurricanes stop data centers; see wind design for data centers.
- Plan fuel and generator structures for longer runs. Larger tanks, generator enclosures and their supports are structural items, and they must survive the same storm as the building.
- Spread risk geographically. A second facility in a different hazard region is the handbook's form of redundancy that no single building can provide. A repeatable steel hall design makes it easier to build that second site.
Retrofit, replace, insure or accept
For existing buildings that fall short of the owner's standard, Chapter 27 lists four options. Retrofit may mean anything from bracing equipment to adding new structural elements, and is easiest when the building is vacant or during a major fit-out. Replace may mean a new resilient building, or a second facility elsewhere. Insure transfers part of the financial loss, though claims can take a long time to settle. Accept may be reasonable when a facility is redundant and poses no threat to life. Our converting existing buildings article looks at the retrofit route.
Where World Steel fits
World Steel designs and fabricates the steel that resilience depends on: frames designed to the risk category and performance targets the owner sets, raised platforms and equipment yards, generator and fuel system supports, rooftop dunnage and screens, and retrofit members for existing buildings. Fabrication takes place in our own plant in Vietnam, with inspection accredited under IAS AC472 and a full quality record for every shipment. Our customers are US contractors; site work, including erection, is their scope, and their Engineer of Record approves and seals the design. See the data center building package for the shell scope, and our lifecycle maintenance page for keeping a steel building ready year after year.
Key takeaways
- Tohoku showed that recovery can take months, generators and fuel were sized for short events, and regional backups can fail together.
- Sandy showed that gray space, fuel systems and switchgear must stay out of basements, and that fuel and communications fail with the grid.
- Recovery plans assume an intact, dry, usable building; code-minimum design only promises life safety.
- Set facility performance standards, design critical buildings to them, and use retrofit, replacement, insurance or acceptance for the rest.
Source: H. Geng (ed.), Data Center Handbook, 2nd ed., Wiley, 2021, Chapters 27 and 37. Ideas are paraphrased; consult the handbook and your design team for project decisions.
Quick answers
What did Superstorm Sandy teach data center owners?
That gray space with switchgear, pumps, UPS and fuel systems must stay out of basements, that fuel supply fails when roads and gas stations lose power, and that communications and staff plans matter as much as hardware.
What did the 2011 Japan earthquake teach?
That bad conditions can last for months, that emergency generators were designed for short runs with only one or two days of fuel, that backup sites in the same region can fail together, and that vendors cannot resupply everyone at once.
Why does the structure matter for disaster recovery?
Every recovery plan assumes the building is still standing, dry and safe to enter. If the frame, roof or envelope fails, no IT failover plan can bring the site back quickly.
What are the options for an existing building that falls short?
The handbook lists four: retrofit, replace, insure or accept the risk. Building a second facility in another region is a form of replacement that adds redundancy.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Crane building designUS crane standards for mill and bay buildings
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors