Span options
Simple, lapped, or heavier where it counts
- Simple spanEach purlin ends at a frame. Easy to place, heavier steel.
- Lapped, continuousPurlins overlap at the frames and act as one beam. Lighter and stiffer.
- Heavier end baysThicker purlins or longer laps in end bays, where loads and uplift peak.
Why it pays
Lighter roofs that go up straight
Less steel per bay
Continuity over the frames lets lighter sections carry the load.
Cut and punched to layout
Every hole is in the right place when the purlin lands.
Checked for uplift
Wind suction can flip the load on a purlin; bracing is designed for both.
Shipped with the frame
Bundled and labeled by bay with the frames they bolt to.
From design to bundle
Every hole punched before it ships
- Purlin designSizes, laps and bracing set from your loads.
- Shop drawingsLengths, holes and laps on the roof framing plan.
- Roll-formed and punchedFormed, punched and cut in our plant.
- Bundled by bayLabeled to the erection drawings.
Specification
Z purlins, line by line
- Section
- Cold-formed Z section; depth and thickness in mm (inches and gauge in parentheses) per design
- Steel
- Zinc-coated or primed cold-formed steel from mills in Vietnam
- Laps
- Lap length at each frame set by the design, bolted through the lap
- Punching
- Bolt holes and sag rod holes punched to the shop drawings
- Design basis
- Designed to AISI S100 for cold-formed steel, with ASCE 7-22 loads
- Bracing
- Sag rods, flange braces and roof diaphragm as the design requires
Photo
Photo
Photo
Photo
Photo
Made in our own plant
IAS AC472-accredited, 2,500 t of steel a month
Questions
Z purlin questions
Why use Z purlins instead of C purlins on the roof?
Z purlins can nest inside each other at the frames, so a run can be lapped and bolted into one continuous beam. That usually saves steel on multi-bay roofs. C purlins cannot nest and are mostly used as simple spans.
What size purlins will my building need?
Depth, thickness and lap lengths come from the design for your loads, frame spacing and roof panels. They are listed in your quote and on the roof framing plan.
Do purlins come galvanized?
They can be made from zinc-coated steel or primed, chosen for the building use and the site.
Are the purlins made in Vietnam?
Yes. They are roll-formed in our plant from steel made in Vietnam and ship with the frame.
More secondary framing: C Purlins · Wall Girts · Eave Struts · Sag Rods · Roof Bracing · Wall Bracing · Secondary Connection Components · Framing Accessories
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Z Purlins
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides