Plate types
Three plates, three joints
Why it pays
Shipped in pieces, built as one
Shippable pieces
Long members split to fit containers.
Holes that line up
CNC drilled in the shop.
Bolt-only site work
Welding done in the plant.
Qualified welding
Under qualified procedures.
- Joint designedPlate, bolts and welds.
- Welded and drilledIn our IAS AC472 accredited plant.
- CheckedFit and weld inspection.
- Shipped markedMating plates labeled.
Specification
Connection plates at a glance
- Types
- End plates, splice plates and cap plates
- Material
- Steel plate to the ASTM grade on the connection design
- Design
- Designed to AISC 360 Chapter J
- Welding
- Shop-welded under qualified welding procedures
- Holes
- CNC drilled to the bolt pattern
- Bolting
- With structural bolts, installed by your contractor to the RCSC Specification
Photo
PhotoWhere it goes
Frames that ship in segments
Questions
Connection plate questions
Why not weld the frame together on site?
Field welding is slow, weather-dependent and harder to inspect. Shop-welded plates and field bolts make erection faster and quality easier to control.
How do you make sure the holes line up?
Holes are CNC drilled from the same shop drawings for both mating plates, then checked before shipping.
Who tightens the bolts?
Your US contractor, to the RCSC Specification and the tightening shown on the connection design.
More connections and anchorage: Anchor Bolts · Structural Bolts · Base Plates · Gusset Plates · Brackets · Cleats · Stiffeners · Welding Assemblies
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Connection Plates
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.