Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Secondary framing · Wall girts

The rails your walls hang on, and the wind leans on

Wall girts run across the columns and carry the wall panels. In a storm they take the wind pressing in and pulling out, and pass it back to the frames. We space and size them for the wind at your address, line them up with doors and windows, and ship them punched and labeled.

Wall elevation: columns, horizontal girts, a door and a window framed between girts, wind arrows pressing on the wall
IllustrationGirt lines in red. Spacing follows your wind pressures.

Girt types

Outside, flush or at the base

  • Bypass girtsRun outside the column flanges: simple, continuous, the most common.
  • Flush girtsSet between the columns, flush with the outer flange, for a thinner wall.
  • Base angle or girtStarts the wall at the slab edge.

Why it matters

Walls that stand up to the storm

  • Designed for wind in and out

    Pressure and suction both checked, tighter at corners.

  • Planned around openings

    Girt lines set so doors and windows frame cleanly.

  • Punched to fit

    Holes for clips, rods and panels in the right place.

  • One package

    Girts ship with the columns they bolt to.

How it is laid out

From wind map to wall drawing

  1. Wind pressuresFrom ASCE 7-22 for your site.
  2. Wall elevationsGirt lines and openings on the drawings.
  3. Formed and punchedRoll-formed and cut in our plant.
Warehouse frame from above, purlins and girts fixed to the rafters and columnsPhoto
Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.
Rows of columns, rafters and purlins inside a large steel buildingPhoto
Inside a finished World Steel frame on a job abroad (location not stated).

Specification

Wall girts at a glance

Sections
Cold-formed Z or C sections
Arrangement
Bypass, flush or a mix, as the wall build-up needs
Spacing
Set by wind pressure and the wall panel span
Openings
Laid out around doors, windows and louvers
Design basis
Designed to AISI S100 with ASCE 7-22 wind pressures
Bracing
Sag rods and flange braces where the design needs them

Questions

Wall girt questions

How far apart are wall girts?

Spacing depends on the wind pressure and the span of your wall panels. It is set in design and shown on the wall elevations.

Bypass or flush girts?

Bypass girts are simpler and continuous. Flush girts make a thinner wall and are used where space or looks matter. Your designer chooses with the wall build-up.

Do girts work with insulated metal panels?

Yes. Spacing and fasteners follow the insulated panel maker’s span tables.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Wall Girts

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Long warehouse frame running beside a road Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.