Insights series · Data center design

Data center design, read from the steel up

Forty in-depth articles on how a US data center is planned, rated, laid out, cooled, powered and built, and what each decision asks of the structural frame. Each one paraphrases and cites the chapter of the Data Center Handbook it follows, then shows the steel World Steel designs and fabricates for it in Vietnam.

40 articles
40 articlesabout 1,000 words or more each
8 topics
8 topicsfrom site plan to campus growth
2,500 t / month
2,500 t / monthabout 2,750 US tons of steel
IAS AC472
IAS AC472first and only plant in Vietnam

Built on Hwaiyu Geng (ed.), Data Center Handbook, 2nd edition (Wiley, 2021), paraphrased and cited by chapter, with US codes and standards. The handbook’s authors and publisher do not endorse World Steel.

Every article in the series

The data center design library

All 40 articles, in the order a project meets them, with the World Steel steel each topic leads to.

Rack A · Site

Strategy and planning

Sustainability, energy, data center types, edge sites and the cost picture.

Aerial view of a large steel-framed industrial building by World Steel Sustainable data center planning: where the structural steel frame fits A sustainable data center is decided long before the first column is set. Strategy, location and life-cycle thinking come first, and each of them leaves a mark on the structural steel that carries the building. Sustainable data center planning6 min read Aerial view of steel roof purlins on a large building frame Data center PUE and the building shell: what the structure has to do with energy Power usage effectiveness is the most quoted number in the data center world. It is usually discussed as a mechanical and electrical topic, but the building shell and its structure quietly set the limits on what the cooling plant can achieve. PUE and the building shell5 min read Aerial view of a long steel-framed building with repeated bays by World Steel Colocation, wholesale and modular data center types: what each asks of the building Hosting, wholesale space, prefabricated halls, containers and stand-alone buildings all deliver computing capacity, but they ask very different things of the building. Here is how the Data Center Handbook sorts them, and what each type means for the steel. Colocation and wholesale types5 min read Hot-dip galvanized steel frames bolted together in the World Steel plant Edge data center buildings: small steel structures for lights-out sites Edge computing pushes small data centers out to cell towers, industrial sites and city lots. These sites are compact and unstaffed, which makes their structure more important, not less: it has to protect the equipment on its own. Edge data center buildings5 min read Built-up steel girders in the World Steel plant in Vietnam Data center TCO and the structure: a small share with a long reach Total cost of ownership is how owners compare data center options over time. The structure is a small slice of that total, which is exactly why it is easy to under-specify, and why a few early decisions about it pay back for decades. TCO and the structure5 min read

Rack B · Risk

Risk and resilience

Risk thinking, site search, Risk Category IV, performance-based seismic design and reuse of existing buildings.

Quality inspector checking fabricated steel members in the World Steel plant Data center risk management: what the human element means for the structure Most data center failures start with people, not equipment. The Data Center Handbook argues that risk falls when knowledge moves cleanly from design to construction to operation. The structural package is one of the first places where that knowledge is written down. Risk management and the frame5 min read Aerial view of a steel-framed building on a cleared industrial site Data center site selection: a structural checklist for the short list Site selection is mostly about power, fiber, taxes and risk. But almost every item on the list also changes the structure: its loads, its foundations, its height above flood level and its delivery route. Here is a checklist for the short list. Site selection checklist5 min read Steel frame being lifted into place on a multi-storey building by World Steel Risk Category IV for data centers: designing above the code minimum Building codes protect lives, not uptime. Most data centers fall into Risk Category II under ASCE 7, the same as an ordinary commercial building. The Data Center Handbook’s structural chapter argues that critical facilities should be designed like essential facilities instead. Risk Category IV design5 min read Stiffened heavy steel members fabricated for a seismic frame in the World Steel plant Performance-based seismic design for data centers: designing for downtime, not just collapse Code seismic design aims to prevent collapse. A data center owner cares about something else: will the facility keep running, and how long will repairs take? Performance-based seismic design answers that question directly. Performance-based seismic design5 min read Interior of a long-span steel warehouse frame Converting existing buildings to data centers: the structural due diligence Warehouses, big-box stores and old plants are tempting data center shells: large footprints, high roofs, power nearby. The Data Center Handbook warns that their structures often have little reserve. Here is the structural due diligence before you sign. Converting existing buildings5 min read

Rack C · Hazards

Natural hazards

Wind, roof snow and rain, flood, lessons from Sandy and Tohoku, and post-event inspection.

Clad steel warehouse with metal wall and roof panels by World Steel Data center wind design: hurricanes, tornadoes and the steel envelope Wind rarely knocks a well-engineered building down. It peels roofs, breaks cladding, throws debris and tips rooftop equipment, and any one of those can stop a data center. Here is how the Data Center Handbook frames wind risk, and what it means for the steel. Wind, hurricane and tornado5 min read Steel building frame standing in snow during erection in Japan, by World Steel Data center roof loads: snow, rain, ponding and rooftop equipment A data center roof is not an ordinary roof. It carries chillers, screens and piping, and every one of them changes how snow drifts and water drains. The Data Center Handbook warns that roof overload is a quiet but real failure mode. Here is what to design for. Roof snow, rain and ponding5 min read Hot-dip galvanized steel members with flanges in the World Steel yard Data center flood design: storm surge, tsunami and keeping critical plant dry Floods are the most common natural disaster in the United States, and water does not need to knock a building down to stop a data center. It only needs to reach the switchgear. Here is what the Data Center Handbook says about flood and tsunami, and how steel helps. Flood and tsunami6 min read Aerial view of a large steel warehouse frame under construction Data center disaster recovery: lessons from Superstorm Sandy and Tohoku Two disasters, a year apart, taught the data center industry hard lessons: the 2011 Great East Japan earthquake and tsunami, and Superstorm Sandy in 2012. The Data Center Handbook collects what went wrong and what worked. Many of the lessons start with the building. Lessons from Sandy and Tohoku5 min read Steel warehouse frame on a construction site Post-disaster inspection plans for data centers: getting back inside fast After a major earthquake or storm, a data center may be structurally fine and still sit empty for weeks, waiting for someone qualified to say it is safe. The Data Center Handbook describes a simple fix: a post-disaster inspection plan arranged before the disaster. Post-disaster inspection plan5 min read

Rack D · Ratings

Standards and ratings

TIA-942, Tier redundancy, ASHRAE thermal guidance, BICSI 002 and NFPA 75.

Long-span steel building interior with clear floor space TIA-942 ratings and the building: what Rated 1 to 4 asks of the structure ANSI/TIA-942 is best known as a cabling standard, but its rating system covers the whole facility, including the architectural and structural side. Here is how the ratings work, according to the Data Center Handbook, and what they ask of the steel. TIA-942 rated levels5 min read Multi-span steel frame with interior columns, a World Steel frame type Data center tiers and redundancy: N+1, 2N and what the frame must carry Every data center conversation eventually turns to tiers and redundancy. N+1, 2N, concurrently maintainable, fault tolerant: the terms describe the power and cooling, but they also decide how much plant the building carries and how it must be separated. And the building itself has no spare. Tiers and redundancy5 min read Steel space truss roof structure built by World Steel ASHRAE data center guidelines: what TC 9.9 means for the building and its steel ASHRAE Technical Committee 9.9 changed how data centers are cooled, by proving that servers tolerate warmer air than anyone assumed. Its Datacom book series also covers structural loads and vibration. Here is what the Data Center Handbook says, and what it means for the building. ASHRAE thermal guidelines5 min read Multi-gable steel building frame, one of the World Steel frame types BICSI 002 data center classes: what the best-practice guide asks of the building ANSI/BICSI 002 is less a rulebook than a full design and operations guide for data centers, with its own availability classes. The Data Center Handbook quotes it on entrance routes, power distribution, grounding and cable trays. Each of those lands on the building. BICSI 002 classes5 min read Steel frame of a multi-storey office building by World Steel NFPA 75 and data center fire suppression: sprinklers, clean agent and the structure Fire protection in a data center has two jobs: protect people, and keep the business running. NFPA 75, insurers and tier standards push well past code minimums. The Data Center Handbook explains the choices, and many of them land on the structure. NFPA 75 and suppression5 min read

Rack E · White space

The white space

Floor loads, ceiling height, column grid, raised floor and the overhead support steel.

Steel floor decking laid on structural steel beams Data center floor load: how much a data hall floor should carry Floor capacity is one of the few data center decisions that cannot be changed later at a reasonable cost. Cabinets keep getting heavier, and technology refresh means old and new equipment stand side by side. Here is what the Data Center Handbook says, and how to size a steel floor. Floor load ratings5 min read Tall clear interior of a steel warehouse building Data center ceiling height: building the clear height from the rack up Ceiling height looks like an architectural number, but in a data center it is the sum of cabinets, busway, cable trays, containment, sprinklers, lighting and a hot-air plenum, all under the roof steel. The Data Center Handbook explains why low ceilings cause trouble. Ceiling height and clearances5 min read Multi-span steel frame with one interior column line, a World Steel frame type Data hall column grid: fitting the steel to the rack layout Columns are the one thing in a data hall that cannot be moved at the next refresh. The Data Center Handbook says to avoid them in small rooms, minimize them in medium ones, and coordinate them with the IT layout in large ones. Here is how to make the steel grid and the rack grid agree. Column grid and rack layout5 min read Aerial view of a steel factory frame with concrete floor slab Raised floor or slab? Choosing the data hall floor and what it means for the steel For years every data center sat on a raised floor. Now many hyperscale halls put cabinets straight on the slab and run everything overhead. The Data Center Handbook explains why the choice is not only about air, and how it moves loads from the floor to the roof steel. Raised floor or slab5 min read Steel frames and roof purlins of a building under construction Overhead busway and cable tray support steel in the data hall In a modern data hall, power, network and containment all hang from the structure. Busway, ladder rack and fiber troughs are light per meter but add up to a serious load, and every one needs a support point. Here is what the Data Center Handbook says and how to design the steel. Overhead busway and tray steel5 min read

Rack F · Cooling

Cooling and air

Containment, economizers, liquid cooling, roof plant and the air the steel breathes.

Painted steel frames packed at the World Steel plant for shipment Hot aisle containment and the structure: plenums, panels and what hangs from the steel Containment is the cheapest big efficiency gain in a data hall: keep hot and cold air apart and the cooling plant can do less. The Data Center Handbook compares the options. Hot aisle containment and chimneys need a return plenum, and that plenum is built on the structure. Containment and the structure5 min read Curved-roof steel building frame on site before cladding Air-side economizer design: what free cooling asks of the data center building Wider ASHRAE temperature ranges turned outside air into a mainstream way to cool data centers. Air-side economizers move huge volumes of air, and that air has to get into and out of the building. The Data Center Handbook explains the options. Here is what they mean for the structure. Air-side economizers5 min read Heavy stiffened steel members fabricated at the World Steel plant Liquid and immersion cooling: the structural loads of the next data hall Air cooling runs out of road somewhere above 100 kW per rack. Cold plates and immersion tanks take over, and they bring something air never did: weight. Fluid-filled tanks, manifolds and piping change the floor and support loads of a data hall. Here is what the Data Center Handbook says. Liquid and immersion cooling5 min read Aerial view of a steel building frame and roof structure Rooftop equipment steel for data centers: dunnage, platforms and screens A data center roof often carries more equipment than any other roof on the block: chillers, dry coolers, air handlers, economizers and their screens. The Data Center Handbook names rooftop plant as a main way wind, snow and earthquakes stop a data center. The answer is in the steel underneath. Rooftop equipment steel5 min read Hot-dip galvanized steel members wrapped for shipment at World Steel Gaseous contamination in data centers: corrosive air, a sealed shell and the right steel finishes Lead-free electronics are more sensitive to corrosive gases than the boards they replaced, and economizers bring more outside air into the hall than ever. The Data Center Handbook explains how to measure and control the risk. A tight building shell and the right steel finishes are part of the answer. Gaseous contamination and coatings5 min read

Rack G · Power

Power and electrical

Generator yards, UPS and battery rooms, microgrids, grounding and electrical galleries.

Fabricated structural steel being loaded for shipment Data center generator yards: the steel behind backup power When the grid fails, a data center runs on its generators, and the generators run on fuel. The Data Center Handbook shows how often that chain broke in real disasters. Much of what keeps it intact is in the yard: where generators sit, what holds them up, and how they survive the same storm. Generator yards5 min read Built-up steel girders at the World Steel plant in Vietnam UPS and battery rooms: the heaviest floor in the data center Batteries are dense, and a UPS system for a large data hall holds a great many of them. Battery rooms carry some of the highest floor loads in the building, need ventilation and spill control, and must be braced in earthquakes. The Data Center Handbook explains the choices. UPS and battery rooms4 min read Mono-slope steel frame, a World Steel frame type used for canopies Data center microgrids: solar, storage and the structures that carry them A microgrid lets a data center keep running when the regional grid goes down, and run cheaper and cleaner when it does not. The Data Center Handbook explains the case. On site, a microgrid is a collection of structures: solar canopies, battery enclosures, generator platforms and switchgear buildings. Microgrid structures4 min read Hot-dip galvanized steel members inside a galvanizing cage at the World Steel plant Data center grounding and bonding: what the structural steel has to do Grounding looks like an electrical topic, but much of what gets bonded in a data hall is steel: racks, ladder racks, support frames, columns. The Data Center Handbook is specific about bare metal at the bond. Here is how that lands on the structural steel and its coatings. Grounding and bonding6 min read Multi-storey structural steel frame with floor beams under construction, steel by World Steel Electrical galleries and multi-story data centers: moving plant out of the white space Modern data centers keep UPS, switchgear and cooling units out of the computer room, either in galleries beside it or on a level above or below. The Data Center Handbook explains why. Here is what each layout asks of the structural frame. Electrical galleries and levels6 min read

Rack H · Build

Build and operate

Project management, modular delivery, fire ratings, reliability and future growth.

World Steel factory office building at the plant in Vietnam where project managers coordinate steel jobs Data center project management: putting the structural steel on the critical path The Data Center Handbook gives project management a whole chapter: kickoff, scope, RACI, critical path, estimates and closeout. Each tool applies directly to the structural steel, which is usually one of the first long-lead packages on a data center schedule. Project management and steel5 min read Stacks of fabricated and packed steel members ready for shipment at the World Steel plant Modular and prefabricated data centers: what step and repeat means for the steel Modular data centers grow in repeatable blocks instead of being built all at once. The Data Center Handbook describes three forms and explains why modular power and cooling save energy. Here is what step and repeat asks of the structural steel. Modular and prefabricated delivery5 min read Painted structural steel members after coating in the World Steel fabrication shop Fire-resistance-rated steel in data centers: ratings, assemblies and protection choices Suppression gets the attention in data center fire design, but walls, floors and the frame that carries them also need ratings. The Data Center Handbook explains where those ratings come from. Here is how they reach the structural steel and how it is protected. Fire-resistance ratings5 min read Wide view of steel roof trusses spanning a large building, structural steel by World Steel Data center reliability engineering: why the structure is a common cause failure Redundant power and cooling only work if one event cannot take out both paths. The Data Center Handbook calls that a common cause failure, and its list includes design errors, wind, snow, flood and earthquake. Here is where the steel frame enters a reliability study. Reliability engineering5 min read Aerial view of a large industrial campus with multiple steel buildings, structural steel by World Steel Future-proofing a data center campus: building a steel frame for the next three generations of IT IT equipment turns over in a few years; the building around it is meant to last decades. The Data Center Handbook returns again and again to that mismatch. Here is how a campus can be planned so the steel frame keeps up with three or more generations of IT. Future-proofing the campus5 min read

Built for large packages

A hyperscale shell is a large, repeated steel package

Data halls repeat bay after bay, phase after phase. Our plant fabricates about 2,500 t (2,750 US tons) of structural steel a month, the line behind the jobs below. None of them is a data center; they show the size of package we run.

Questions about the series

Data center series Q&A

What is the data center design series?

Forty in-depth articles for US contractors, owners and engineers on how a data center is planned, rated, laid out, cooled, powered, protected and built. Each article reads its topic from the structural side: what the frame has to carry, where it sits on the schedule, and which steel World Steel designs and fabricates for it.

Which source do the articles follow?

The Data Center Handbook, 2nd edition, edited by Hwaiyu Geng (Wiley, 2021). Each article paraphrases the chapter it follows and cites it by number, and adds the US codes and standards a project here is built to, such as the IBC, ASCE 7, TIA-942, ASHRAE guidance and NFPA 75. The handbook’s authors and publisher do not endorse World Steel.

Does World Steel supply power, cooling or IT equipment?

No. Power, cooling, fire suppression and IT systems are designed by your engineers and procured separately. World Steel supplies the structural steel: frames, trusses, platforms, racks, dunnage and the support steel that carries that equipment.

Who approves the design and erects the steel?

The US contractor, our customer, with their Engineer of Record. We deliver calculations and drawings ready for their review and approval; the permit and erection are their scope.

How large a data center package can you take?

Our own plant fabricates about 2,500 metric tons (2,750 US tons) of structural steel a month, so halls can be fabricated in overlapping phases while earlier halls are erected.

How do I get the steel for my project scoped?

Send your drawings or owner criteria through the request-a-quote page. Shop drawings are included with every project, and fabrication progress is visible in real time in PEB Studio.

Scoping a data center campus?

Send the owner criteria, a layout or just the site and the hall count. Our engineers confirm the steel World Steel would design and fabricate, from a plant that turns out 2,500 metric tons of structural steel a month.