Support types
Three ways to carry a duct run
Why it pays
Ducts that pass inspection the first time
- Loads where they belongOn framing checked for them.
- Inspection-readySupports shown on the drawings.
- Seismic coveredBracing where the code asks.
- Trades coordinatedDuct routes set before steel ships.
Specification
Duct support at a glance
- Members
- Trapeze beams, hanger beams and supplementary framing
- Design
- AISC 360; bracing per ASCE 7 Chapter 13 where required
- Inputs
- Duct sizes, routing and weights from your mechanical engineer
- Attachment
- To primary or secondary framing at checked points
- Finish
- Primed or galvanized
- Marking
- By run and grid line
- Duct routingSizes, runs and weights.
- Support points checkedAgainst the building frame.
- Steel fabricatedTrapezes and hanger beams.
- Shipped by runMarked for the erector.
Where it goes
Buildings with serious ductwork
- Manufacturing plantsProcess exhaust and supply air.
- Data center shellsLarge supply and return ducts.
- Seismic regionsBracing to ASCE 7 Chapter 13.
Photo
PhotoQuestions
Duct support questions
Who designs the duct?
Your mechanical engineer designs the duct and its routing. We design the steel that receives it and check the building frame at each support point.
Who hangs the duct?
Your erector installs the support steel. Your sheet metal contractor hangs the duct.
When do you need the duct layout?
Before shop drawings, so support points are part of the frame design and not added later.
More building services support: Wall Ventilators · Mechanical Equipment Support Steel · HVAC Platforms · Cable Support Steel · Lighting Support Structures
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Duct Support Steel
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides