Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Primary structural system · Built-up columns

Columns welded to the section your design needs, not the nearest rolled shape

When a rolled W-shape is too heavy, too shallow or simply not available, a built-up column puts steel exactly where the loads are. We cut the plate, weld web to flange on automatic submerged-arc lines and deliver each column with its base plate, stiffeners and clips already on.

  • Steel where it worksWeb and flange sized separately
  • IAS AC472 plantAccredited since 2019
  • Shop drawings includedAt no extra cost
Section through a built-up steel column: two flange plates welded to a web plate flange width, mm section depth, mm web height Flange plate Web plate Submerged-arc fillet weld
IllustrationDepth, flange width and plate thickness are set by your design, in mm (inches in the submittals).

Data plate · Built-Up Steel Columns

Section
Welded I-section, prismatic or tapered, from plate
Steel grades
To the ASTM grades on your drawings, such as A572 Gr 50 or A36, with mill certificates
Welding
Flange-to-web by automatic submerged arc; all other welds to qualified AWS D1.1 procedures
Seismic
AISC 341 detailing and AWS D1.8-qualified welders when the seismic system calls for it
Fittings
Base plate, cap plate, stiffeners, end plates and purlin or girt clips shop-welded
Finish
Blasted and shop-primed, painted, hot-dip galvanized or duplex, to the site exposure

Designed to AISC 360 and welded to AWS D1.1 in an IAS AC472-accredited plant. Your Engineer of Record approves the design.

Why contractors choose it

Steel placed where the loads are, delivered ready to bolt

  • Lighter for the same load

    Web and flange are sized independently, so you stop paying for steel a catalog shape forces on you.

  • Any depth your design needs

    Deep or tapered columns stiffen a frame without jumping to the next, much heavier rolled size.

  • Arrives ready to set

    Base plate, stiffeners and clips come welded on, so your erector bolts instead of fabricating on site.

  • Records with every column

    Mill certificates, weld and dimensional inspections and coating readings travel with the submittal.

On our shop floor

From plate to packed column, in one plant in Vietnam

Every column follows the same line, tracked piece by piece in PEB Studio so your team sees where it is without asking.

  1. Plate cut on CNC machinesFlanges and webs cut on CNC laser (up to 100 mm, about 4 in), oxy-fuel and plasma machines from plate traced by heat number.
  2. Fit-up to the shop drawingFitters assemble each column against its own Tekla shop drawing.
  3. Submerged-arc weldedAutomatic lines weld web to flange for consistent, full-length welds.
  4. Inspected and measuredVisual and dimensional checks, with NDT where your inspection plan asks for it.
  5. Blasted and coatedShot-blasted, then coated to the system your exposure needs.
  6. Tagged and packedMarked with its erection mark and packed in the order your crew sets it.
Welder looking over the stiffeners and end plate of a heavy columnPhoto
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Two welders operating a submerged-arc welding station on a memberPhoto
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Quality inspector taking dimensions on a finished steel memberPhoto
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.

Questions

What engineers and buyers ask about built-up steel columns

When is a built-up column better than a rolled W-shape?

When the loads, height or stiffness your design needs fall between rolled sizes, or call for a deeper or tapered section. A built-up column carries the same load with less steel, and that saving repeats on every column of a large building.

Which ASTM grades can you supply?

We order plate to the grades your Engineer of Record specifies, typically ASTM A572 Grade 50 or A36, from mills in Vietnam. Mill certificates come with the submittal, and EN 10204 3.1 certificates with Charpy results can be supplied on request.

Can the columns be part of a seismic force-resisting system?

Yes. Where your design calls for AISC 341 detailing, we weld with AWS D1.8-qualified procedures and welders and can mark protected zones on the members.

Who approves the column design?

We prepare calculations and shop drawings to your job’s code basis. Your Engineer of Record reviews and approves them, and the PE seal and permit stay with your team.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Built-Up Steel Columns

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Welder looking over the stiffeners and end plate of a heavy column Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.