
Pick a layout
Six ways to lay out the same system
Every layout uses the same frames, panels and connections, engineered to the loads of your site.
In the package
Everything that ships with your building
- Primary framesTapered columns and rafters, base plates and end plates
- Secondary steelZ and C purlins, girts, eave struts, bracing
- Roof systemStanding seam or through-fastened panels and trims
- Wall systemSingle-skin or insulated panels, corners and flashings
- OpeningsFramed openings, doors and windows from partner plants in Vietnam
- Bolts and anchorsStructural bolts, anchor rods and setting plan
- DrawingsAnchor bolt plan, erection drawings and shop drawings
- PEB StudioLive tracking of every piece from cutting to packing
Why it works
Built for contractors who erect for a living
- One package, one supplierEvery structural and envelope part comes from one fabricator, so nothing is missing or mismatched on site.
- Steel sized to your siteFrames follow your loads, not a catalog building, so you are not paying for steel the site does not need.
- Bolted, not field-weldedEnd-plate connections let your crew erect with bolts and lifts, not welding rigs.
- Production you can watchPEB Studio shows each piece moving through the plant, so your schedule rests on facts.
How a job runs
From address to anchor bolts to containers
- Site loads and layoutYou send the footprint, eave height, address and use; we confirm the code basis.
- Design for your Engineer of RecordCalculations and drawings prepared for your Engineer of Record to review and approve.
- Anchor bolt plan firstYour foundation crew gets the anchor plan while the steel is being made.
- Fabricated in one plantFrames, secondary steel and panels made and checked in Vietnam.
- Packed by erection sequenceBundles tagged so the first pieces up come off the first container.
Specification
Design basis and package standards
- Design loads
- ASCE 7-22 wind, snow, seismic and collateral loads for your address
- Code basis
- IBC as adopted locally; members designed to AISC 360, cold-formed members to AISI S100
- Industry guidance
- Designed following MBMA Metal Building Systems Manual practice
- Frames
- Welded tapered I-sections with bolted end-plate connections
- Envelope
- Roof and wall panels, trims and closures from coated coil made in Vietnam
- Quality
- Designed and fabricated under IAS AC472 accreditation, held since 2019
Photo
Photo
PhotoQuestions
Pre-engineered buildings, answered
What is included in a World Steel pre-engineered building?
The primary frames, secondary steel, roof and wall panels, trims, bolts and the anchor bolt and erection drawings. Doors and windows from partner plants in Vietnam can be added. Foundations and erection stay with your team.
Is the building designed for my exact site?
Yes. Frames and panels are designed to the ASCE 7-22 wind, snow and seismic loads at your address and to the code your jurisdiction adopted. Your Engineer of Record reviews and approves the design.
How large a building can you supply?
Our plant fabricates 2,500 metric tons of structural steel a month and has delivered single packages of up to 5,000 t. Spans and bay sizes are set by design for each project, not promised in advance.
Can it carry a crane or a mezzanine?
Yes. Crane runway brackets, stepped columns and mezzanine framing can be designed into the same frames, so the loads are checked together.
More in Primary Structural System: Rigid Frame Systems · Built-Up Steel Columns · Built-Up Steel Rafters · Tapered Frames · Hot-Rolled Structural Members · Steel Trusses · Long-Span Steel Structures · Multi-Storey Steel Framing
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Pre-Engineered Metal Buildings
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.