Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Ventilation & building services · Equipment support steel

Heavy equipment, carried by the frame it was designed with

Air handlers, condensers, exhaust fans and pumps are heavy, they vibrate, and in seismic areas they move. Put them on light purlins and you get sagging roofs and late change orders. We design their support frames together with the primary structure, so the columns and rafters see the equipment loads from the first calculation, and the frames ship with the building.

Steel frame carrying two equipment units on dunnage beams, with load arrows running down the columns to the footings Equipment loads in the frame design Dunnage beams
IllustrationSupport frames designed with the primary structure.

What we carry

Six kinds of equipment, one frame design

  • Air handlersLarge units inside or on the roof.
  • CondensersOutdoor units on roofs or grade frames.
  • Exhaust fansWall and roof fans with their curbs.
  • Pumps and tanksHeavy, concentrated loads.
  • GeneratorsFrames and platforms for backup power.
  • Process equipmentMachines that need their own steel.

Why it pays

No sagging roofs, no late change orders

  • Loads in the frame

    Columns and rafters sized for them.

  • Ready for seismic

    Anchorage checked under ASCE 7.

  • No late change orders

    Steel for the units is in the first design.

  • Ships with the building

    One package, one set of marks.

Specification

Support steel at a glance

Frames
Beams, posts and dunnage steel under each unit
Design
AISC 360 steel, designed with the main frame
Anchorage
Equipment anchorage and seismic forces per ASCE 7 Chapter 13, using the supplier's weights
Inputs
Equipment schedule with weights, footprints and anchor points
Finish
Primed and painted, or galvanized for outdoor frames
Marking
Piece marks matching the building erection drawings

How it works

From equipment schedule to steel

  1. Equipment scheduleWeights, footprints, anchor points.
  2. Frames designedWith the primary structure.
  3. Fabricated and coatedIn our IAS AC472 plant.
  4. Shipped with the buildingMarked for the erector.

Questions

Equipment support questions

What do you need to design the frames?

An equipment schedule with each unit's operating weight, footprint and anchor points. Early supplier data is fine; we update the frames when final submittals arrive.

Who sets and anchors the equipment?

Your erector sets the support steel. Your mechanical contractor places and anchors the units. We design and fabricate the steel only.

What about vibration?

Your mechanical engineer specifies isolators where they are needed. We design the frame to carry the units with their isolators.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Mechanical Equipment Support Steel

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of ventilation & building services support, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.

Covered in our state guides