Three zones
Every platform is laid out in three parts
Why it pays
Protect the roof, protect the crew
Roof protected
Units and feet off the panels.
Safe service
Guarded deck for technicians.
Loads planned
Frame sized for unit weights.
Easier maintenance
Room to open and pull units.
Specification
HVAC platforms at a glance
- Framing
- Steel beams and posts, designed to AISC 360 with the main frame
- Deck
- Steel grating or checker plate
- Guards
- Guardrails designed to the IBC or OSHA 1910 Subpart D, whichever applies
- Anchorage
- Unit anchorage checked under ASCE 7 Chapter 13
- Access
- Stairs or ladders to the platform
- Finish
- Galvanized or painted for outdoor exposure
Photo
PhotoHow it works
Unit schedule in, platform out
- Unit scheduleWeights and service clearances.
- Platform laid outUnit, service and access zones.
- FabricatedBeams, grating and rails.
- Shipped markedReady for your erector.
Questions
HVAC platform questions
Roof platform or interior platform?
Both. Roof platforms span between main frames above the roof line; interior platforms hang from or stand under the structure. We frame either into the building design.
Who supplies the unit weights?
Your mechanical engineer or HVAC supplier. We design the platform to those weights and service clearances.
Does the platform include stairs and rails?
Yes, if you want them. Guardrails are designed to the IBC or OSHA 1910 Subpart D, whichever applies to the project.
More building services support: Wall Ventilators · Mechanical Equipment Support Steel · Duct Support Steel · Cable Support Steel · Lighting Support Structures
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for HVAC Platforms
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides