Engineering and codes

Overhead busway and cable tray support steel in the data hall

In a modern data hall, power, network and containment all hang from the structure. Busway, ladder rack and fiber troughs are light per meter but add up to a serious load, and every one needs a support point. Here is what the Data Center Handbook says and how to design the steel.

· updated November 23, 2026 · 5 min read · World Steel USA engineering team

When a data hall drops its raised floor, everything that used to run underneath moves overhead. Even halls with raised floors increasingly carry power and network above the cabinets. Chapter 23 of the Data Center Handbook edited by Hwaiyu Geng (2nd edition, Wiley, 2021) describes the options for overhead power and network pathways, and Chapter 12 gives the TIA limits for trays and hanging capacity. The result is a dense layer of overhead busway, ladder rack, fiber trough, containment, lighting and sprinkler piping, all hanging from the roof or floor steel. This article explains what that layer needs from the structure.

Busway or whips

Chapter 23 describes two ways to bring power overhead. The first is power whips, or wire in conduit, run from a distribution panel to receptacles above each cabinet. The second is a wire busway with hot-swappable plug-in units. The handbook notes that busway provides greater flexibility and easier reconfiguration as equipment changes over the life of the data center: the circuit feeding each cabinet can be changed simply by inserting a plug-in unit with the right breaker and receptacle. Where busway is used, remote power panels are typically not needed.

Busway brings its own coordination rules:

  • It must be coordinated with sprinkler heads, network pathways and lighting.
  • With A and B busways, the handbook says their horizontal or vertical positions must leave enough separation to insert plug-in units without clashing with the other busway or its plug-ins.
  • Busway positioned over the cabinets should be reviewed with the local authority early, to make sure it does not violate safe working space rules.

Network pathways overhead

For network cabling, the handbook says overhead distribution is generally the preferred method, using:

  • top-of-cabinet troughs in small rooms, which minimize ceiling height but make it hard to move a cabinet, because the cabinet carries the pathway;
  • basket trays, economical and easy around elevation changes;
  • ladder racks, which ease cable transitions down to cabinets and are rigid enough to carry fiber troughs attached directly to them;
  • fiber optic troughs, designed for fiber with controlled bend radius, typically 50 mm (2 in), with larger trunks needing more.

The handbook adds that cable trays used for power are not recommended for network distribution inside the computer room, so power and network often run on separate systems, with separation for electromagnetic interference.

TIA limits that shape the layout

Chapter 12 summarizes limits from TIA, NFPA and the National Electrical Code:

Item Limit summarized in the handbook
Cable depth in any tray 150 mm (6 in), regardless of tray depth
Fill, trays without solid bottom 50% of cross-section
Fill, solid-bottom trays 40% of cross-section
Spacing between stacked trays 300 mm (12 in) top of lower tray to bottom of upper tray
Ceiling hanging capacity At least 1.2 kPa (25 lb/ft²), 2.4 kPa (50 lb/ft²) recommended

The 150 mm depth limit means capacity comes from width and from more tray levels, not deeper trays. More levels mean more height and more hangers. Our ceiling height article shows how the layers stack up.

Designing the support steel

From the structure's point of view, the overhead layer is a set of line loads hanging at regular intervals. Good practice for the steel:

  1. A support grid designed into the roof framing. Secondary members or rails at a regular spacing, aligned with the rack rows, give every pathway a support point without improvised attachments to purlins or deck.
  2. Hung load allowance per bay. Design for the recommended 2.4 kPa (50 lb/ft²) or the actual stack, whichever is higher, including busway, trays, cables at full fill, containment, lighting, sprinkler piping filled with water, and future additions.
  3. Short drops. Supports close to the structure reduce rod length and sway, which matters for bracing and for clear height.
  4. Independent supports for heavy items. Busway and its plug-in units, and any overhead coolant piping for liquid cooling, may need their own supports rather than sharing tray hangers.
  5. Deflection control. Busway joints and long fiber runs do not like large deflections; members carrying them should have tight limits.
  6. Connection details for the trades. Clips, beam clamps or bolted plates, chosen with the electrical contractor, so nothing is welded or drilled into the frame on site without approval.

Our cable tray supports, cable support steel and pipe and cable racks pages show typical arrangements.

Seismic bracing

Chapter 27 of the handbook, on structural resilience, stresses that nonstructural components, including piping, ducts and electrical equipment, must be braced so they stay intact during earthquake shaking, and Chapter 1 points to FEMA guides on seismic restraints for ducts, pipes and electrical equipment. In a seismic region, every busway run, tray level and containment system needs lateral and longitudinal bracing back to the structure, and the structure must be designed for the brace forces. Bracing also takes space, which must be allowed for in the stack-up. See our seismic data centers guide and the performance-based seismic design article.

Coordinate once, at the start

The handbook's broader message in Chapter 23 is that overhead power, network, containment, lighting, detection and suppression must be coordinated together, and the decisions, such as whether pathways sit in the hot or cold side of containment, should be made early. For the steel, the coordination output is simple: a support grid, a hung-load allowance, and a clear-height target. Once those are fixed, the IT and electrical teams can change their layouts for decades without touching the frame. Our articles on BICSI 002 and TIA-942 explain why redundant A and B routes double the overhead layer in higher-rated facilities.

Where World Steel fits

World Steel designs and fabricates roof and floor framing for data halls with service support grids, hung-load capacity and deflection limits set for busway and tray systems, plus the secondary support steel, unistrut-ready rails and brace attachment points the trades need. Fabrication takes place in our own plant in Vietnam, with inspection accredited under IAS AC472. Our customers are US contractors; site work, including erection, is their scope, and their Engineer of Record approves and seals the design. See the data center building package for the full shell scope.

Key takeaways

  • The handbook favors busway with plug-in units for flexible overhead power, with A and B busways spaced so plug-ins do not clash.
  • Overhead network uses ladder rack, basket tray and fiber troughs; power trays are not recommended for network.
  • TIA limits cable depth to 150 mm, stacked trays to 300 mm spacing, and recommends 2.4 kPa (50 lb/ft²) hanging capacity.
  • A support grid designed into the roof steel, with seismic bracing where needed, keeps the overhead layer flexible for the building's life.

Source: H. Geng (ed.), Data Center Handbook, 2nd ed., Wiley, 2021, Chapters 1, 12, 23 and 27. Ideas are paraphrased; consult your design team for project decisions.

Quick answers

Why use overhead busway instead of power whips?

The Data Center Handbook notes that busway with hot-swappable plug-in units gives greater flexibility to reconfigure power as equipment changes, while whips or wire in conduit are fixed.

How much should the structure be able to hang?

TIA guidance summarized in the handbook calls for at least 1.2 kPa (25 lb/ft²) of ceiling hanging capacity, with 2.4 kPa (50 lb/ft²) recommended.

How deep can cabling be in a tray?

Cabling inside a tray must not exceed 150 mm (6 in) in depth, regardless of tray depth, and stacked trays need 300 mm (12 in) between them.

Do overhead pathways need seismic bracing?

In seismic regions, yes. Trays, busway and containment must be braced back to the structure so they stay intact during shaking.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

Data center design series

Forty in-depth articles on planning, rating, laying out, cooling, powering, protecting and building a US data center, each read from the structural side: what the frame has to carry, where it sits on the schedule, and how World Steel designs and fabricates the steel for it in Vietnam.

Built on Hwaiyu Geng (ed.), Data Center Handbook, 2nd edition (Wiley, 2021), paraphrased and cited by chapter, with US codes and standards.

Rack AStrategy and planning

Sustainability, energy, data center types, edge sites and the cost picture.

Rack BRisk and resilience

Risk thinking, site search, Risk Category IV, performance-based seismic design and reuse of existing buildings.

Rack CNatural hazards

Wind, roof snow and rain, flood, lessons from Sandy and Tohoku, and post-event inspection.

Rack DStandards and ratings

TIA-942, Tier redundancy, ASHRAE thermal guidance, BICSI 002 and NFPA 75.

Rack EThe white space

Floor loads, ceiling height, column grid, raised floor and the overhead support steel.

Rack FCooling and air

Containment, economizers, liquid cooling, roof plant and the air the steel breathes.

Rack GPower and electrical

Generator yards, UPS and battery rooms, microgrids, grounding and electrical galleries.

Rack HBuild and operate

Project management, modular delivery, fire ratings, reliability and future growth.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.