Four jobs
What one member does at the eave
- Supports the roof edgeTop flange sloped to the roof pitch.
- Tops the wallLower flange catches the wall panels.
- Ties the framesStrut action along the eave line.
- Carries the gutterGutter brackets fix to the strut.
Why it matters
A tidy, tight eave line
- Formed to the pitchRoof panels sit flat on the strut, no shims.
- A clean drip edgeRoof edge, wall top and gutter line up.
- Frames held in lineThe strut ties every frame at the eave.
- Shipped with the frameBundled with the sidewall steel.
How it is made
Formed to your roof pitch
- Roof pitch and eave heightFrom the approved drawings.
- Roll-formed to the pitchFormed and punched in our plant.
- Labeled by sidewallReady for the erection sequence.
Photo
PhotoSpecification
Eave struts at a glance
- Section
- Cold-formed eave strut with the top flange set to the roof pitch
- Steel
- Zinc-coated or primed cold-formed steel
- Span
- Frame to frame, sized for roof edge and wall loads
- Connections
- Bolted to the frame at each column with clips
- Design basis
- Designed to AISI S100 with ASCE 7-22 loads
- Interfaces
- Roof panels, wall panels, eave trim and gutter brackets
Where it goes
Every sidewall has one
Questions
Eave strut questions
What does an eave strut do?
It supports the edge of the roof panels, tops the wall panels, ties the frames together at the eave and carries the gutter brackets.
Is it different from a girt?
Yes. The eave strut has a top flange sloped to the roof pitch, so roof panels sit flat on it. A girt is a plain Z or C on the wall.
Does the eave strut carry the gutter?
Yes. Gutter brackets fix to it at the spacing in the drainage design.
More secondary framing: Z Purlins · C Purlins · Wall Girts · Sag Rods · Roof Bracing · Wall Bracing · Secondary Connection Components · Framing Accessories
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Eave Struts
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides