Why one panel
Three layers, one lift
- One pass on the roofWeather sheet, insulation and liner go on together.
- Tight envelopeContinuous insulation helps cold rooms and conditioned spaces.
- Finished ceilingThe painted liner is the interior finish, easy to clean.
- Fewer tradesNo separate blanket, liner or vapor layer crew.
Specification
What we confirm for each job
- Build-up
- Steel face, insulating core, steel liner, bonded in the factory
- Core
- Foam or mineral core; type and thickness confirmed in your quote
- Thermal value
- Set to your energy code; confirmed from the panel maker’s test data
- Fire
- Fire classification only as shown by the panel’s published test data for your project
- Joints
- Interlocking side joints with concealed or through fasteners per the system
- Code basis
- IBC and your energy code, reviewed by your Engineer of Record
How it is chosen
From your energy code to a crated panel
- Energy and fire targetsYour energy code and fire requirements set the panel.
- Panel and core matchedCore, thickness and test data confirmed for your use.
- Layout to purlinsPanel lengths and fixings on the roof drawings.
- Protected for shippingCrated flat with protective film.
Photo
Photo
PhotoWhere it goes
Buildings that need a tight envelope
Questions
Insulated roof panel questions
What insulation value do the panels have?
It depends on the core type and thickness. We choose the panel to meet your energy code and confirm the value from the panel maker’s test data in your quote.
Are the panels fire rated?
Only where the specific panel has published fire test data for the use. We confirm this project by project and never assume a rating.
Can insulated roof panels be used on low slopes?
Yes, with a panel and joint designed for low slope. The minimum slope follows the panel system’s data.
Are they made in Vietnam?
Yes. Like everything we supply, the panels come from Vietnam and ship with your steel package.
More roofing: Metal Roof Panels · Standing Seam Roofing · Through-Fastened Roofing · Roof Insulation · Ridge Caps · Roof Flashings · Roof Ventilators · Roof Access Components
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Insulated Roof Panels
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions