Why it pays
A short pipe that protects a long foundation
- No overflowEnough downspouts for the roof.
- Spaced rightAlong the eave per the code.
- Matched to wallsNeat lines on the facade.
- Complete kitElbows and brackets included.
Specification
Downspouts at a glance
- Material
- Formed coated steel, color-matched to the walls where available
- Sizing and spacing
- From the plumbing code rainfall rates, confirmed by your project engineer
- Parts
- Straight lengths, elbows, offsets and wall brackets
- Discharge
- To splash blocks or the storm system, by your contractor
- Fixing
- Brackets to girts or wall panels
- Supply
- With the gutters
How it works
Sized, spaced and shipped with the walls
- Count and sizeFrom the roof area.
- Locations drawnOn the wall elevations.
- Shipped as kitsBy downspout location.
Where they go
Projects we drain
- WarehousesLong eaves need many downspouts.
- Cross-dock terminalsPlaced between dock doors.
- Florida projectsTropical downpours.
Photo
PhotoQuestions
Downspout questions
How many downspouts does my building need?
It depends on the roof area, the rainfall rate in the code and the downspout size. Your project engineer confirms the count; we locate them on the elevations.
Can downspouts avoid the dock doors?
Yes. We place them between doors on the elevations so they are not in the way of trucks.
Do you connect them to the storm drain?
No. Your contractor connects downspouts to splash blocks or the storm system on site.
More drainage and weather protection: Gutters · Flashings · Ridge Closures · Eave Trims · Rainwater Accessories · Canopies · Entrance Covers · Loading Dock Canopies
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Downspouts
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides