Mechanical plant has to go somewhere, and on many data centers it goes on the roof. Chillers, dry coolers, condensers, air handlers, economizer units, exhaust fans and the screens around them can add up to one of the heaviest and most exposed equipment zones in any building type. Chapter 27 of the Data Center Handbook edited by Hwaiyu Geng (2nd edition, Wiley, 2021), on structural design and natural disaster resilience, returns to rooftop plant again and again: in wind, in snow, in rain and in earthquakes. Good rooftop equipment steel is how a design answers all four. This article summarizes the handbook's warnings and the steel that addresses them.
Wind: the main way a roof stops a data center
The handbook is direct. Apart from structural collapse, the main causes of function loss after a major windstorm are damage to the cladding and damage to rooftop equipment. Unanchored equipment can be blown over, and units can be damaged by windborne debris. Because cooling is essential, losing rooftop air handling plant can force a shutdown.
Its mitigation advice for new buildings is twofold:
- Anchor equipment for the design wind forces.
- Surround rooftop equipment with wind screens designed for the maximum wind forces and made of a material that can protect the equipment from debris strikes.
Screens are not decoration. A screen wall catches wind over its full area and delivers that force to its posts and on into the roof structure. Screen posts, girts, bracing and connections must be designed as structure, for the same wind as the building. Our article on wind design for data centers covers the envelope side.
Snow and rain: equipment changes how the roof loads
Chapter 27 also notes that rooftop equipment creates obstructions where snow drifts, and that equipment and its supports can block drainage paths and create local ponding. The handbook recommends that when new rooftop equipment is planned, its effect on drainage and drifting must be considered, and that equipment may need to be relocated, placed on elevated platforms so water can drain underneath, or the roof strengthened locally.
That is the strongest argument for raised dunnage. Equipment on steel frames above the roof surface lets water flow to drains, lets snow pass under rather than drift against a solid curb, and keeps the roofing accessible for repair. Our article on roof snow, rain and ponding explains drift and ponding in more detail.
Earthquakes: anchorage is not the same as function
For seismic regions, the handbook explains that equipment can shift and topple if not anchored, and that building codes set anchorage design forces based on expected floor accelerations, which are higher at the roof than at grade. But it adds an important distinction: anchorage prevents toppling, it does not guarantee that the equipment will work afterward. US codes require seismic certification by the manufacturer for equipment in essential facilities that must remain operable after an earthquake. The handbook stresses that in a data center, equipment is more critical than the structure and may need as much design attention.
Vibration isolators complicate the picture. Rooftop chillers and fans often sit on spring isolators to keep vibration out of the building; in seismic regions, isolators need restraints or snubbers so the unit cannot walk off its supports. The dunnage must be designed for the restraint forces. Our seismic data centers guide covers anchorage and bracing.
What good rooftop steel looks like
| Element | Design focus |
|---|---|
| Dunnage beams | Span between main frame lines so loads go directly into rafters or girders, not into purlins or deck |
| Platforms | Grating or plate decks for units that need service access on all sides; handrails and access ladders or stairs |
| Posts through the roof | Few, well-flashed penetrations, ideally at frame lines; height enough for roofing work and snow clearance |
| Screen structure | Posts, girts and bracing for full wind on the screen area, plus debris resistance where specified |
| Anchorage points | Bolt patterns matched to equipment, with seismic and wind uplift capacity, and isolator restraints where used |
| Future positions | Spare dunnage or capacity for later units, so expansion does not mean new penetrations on a live roof |
| Corrosion protection | Galvanizing or a coating system suited to rooftop exposure, especially near cooling towers and coasts |
Designing the roof and the plant together
The roof frame and its dunnage should be modeled together, with the real equipment weights, operating loads with water, wind on equipment and screens, seismic anchorage forces, snow drift around units and maintenance loads. That avoids the classic problem of a roof designed for a uniform load that then receives concentrated plant in places the frame was never meant to carry it. It also lets deflection limits be set so that piping and equipment connections are not strained.
The handbook's chapters on economizers and mechanical design add one more point: the trend toward more efficient plant, such as economizer units with evaporative sections and larger air handlers, generally means heavier and larger equipment. Leaving reserve capacity on the roof keeps those choices open. Our PUE and the building shell and air-side economizer articles explain why.
Existing roofs
For conversions, Chapter 27 warns that existing warehouse and big-box roofs often have little reserve capacity, and that adding equipment usually means local strengthening or independent support steel spanning to new columns or main frame lines. That work is far easier before a building is fitted out. See converting existing buildings to data centers.
Where World Steel fits
World Steel designs and fabricates rooftop dunnage, equipment platforms, screen structures and access steel for data centers, modeled with the roof frame for gravity, wind, snow and seismic loads, and can hot-dip galvanize exposed steel. Fabrication takes place in our own plant in Vietnam, with inspection accredited under IAS AC472. Our customers are US contractors; site work, including erection, is their scope, and their Engineer of Record approves and seals the design. See HVAC platforms, mechanical equipment support steel, our heavy roof and MEP loads guide and the data center building package.
Key takeaways
- The handbook names rooftop equipment damage as a main cause of function loss after windstorms; anchor units and use debris-resistant screens designed for maximum wind.
- Equipment causes snow drift and ponding; raising it on dunnage keeps drainage and snow paths open.
- Seismic anchorage prevents toppling but not loss of function; essential facilities need certified equipment and restrained isolators.
- Model the roof, dunnage, screens and plant together, with reserve capacity for future, heavier equipment.
Source: H. Geng (ed.), Data Center Handbook, 2nd ed., Wiley, 2021, Chapters 13, 24 and 27. Ideas are paraphrased; consult your Engineer of Record for project decisions.
Quick answers
Why is rooftop equipment a risk for data centers?
The Data Center Handbook names damage to rooftop equipment as one of the main causes of function loss after windstorms. Unanchored units can blow over or be hit by debris, and losing cooling plant can force a shutdown.
How should rooftop units be protected from wind?
Anchor them for the design wind and, where needed, surround them with wind screens designed for maximum wind forces and made of a material that resists debris strikes.
Does anchoring equipment guarantee it works after an earthquake?
No. Anchorage prevents toppling, but function depends on the equipment itself. US codes require manufacturer seismic certification for equipment in essential facilities that must operate after an earthquake.
Why raise equipment on dunnage instead of setting it on the roof?
Raised dunnage keeps drainage paths open, lets snow pass, puts loads directly into the main frame and gives access for roofing and maintenance.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Crane building designUS crane standards for mill and bay buildings
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors