Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Primary structural system · Rigid frames

Frames that hold their shape without bracing in the way

A rigid frame resists wind and gravity through stiff knee and ridge connections, so the building stays square without cross-bracing across the openings you need. We taper every member to follow the bending moment and bolt it together with shop-welded end plates.

Elevation of a rigid steel frame with its bending moment diagram, largest at the knees KneeRidgeKneeBaseBase
IllustrationBending moment is highest at the knee, so that is where the frame is deepest. Illustration, not a design.
Knee
Deepest point, where moment peaks
Ridge
Bolted end plates at the apex
Base
Pinned or fixed, per your design

Why rigid frames

Stiff joints, open bays, no wasted steel

  • Open walls and roof

    Frame action replaces bracing in the bays where doors, windows or future expansion go.

  • Material where the moment is

    Tapering puts depth at the knee and saves steel where the moment drops away.

  • Bolted at every joint

    Knee and ridge splices bolt up on site, no structural field welding.

  • Built to your dimensions

    Span, eave height and roof pitch come from your plan, not a standard catalog.

How we make them

From frame analysis to a trial-fit connection

  1. Frame analysisMembers sized for each load combination at your site.
  2. Tekla shop modelEvery plate, hole and weld detailed in one model.
  3. Welded on automatic linesWeb-to-flange welds by submerged arc.
  4. Trial-fit and inspectedConnections checked against the shop drawing before coating.

Specification

Rigid Frame Systems

MembersTapered or prismatic welded I-sections from plate
ConnectionsShop-welded end plates, field-bolted at knee and ridge
BoltingASTM F3125 high-strength bolts, installed to the RCSC Specification
DesignAISC 360, with ASCE 7-22 loads; AISC 341 when the seismic system needs it
BasesPinned or fixed bases detailed with the anchor rod plan
FinishPrimer, paint system, galvanizing or duplex to suit the exposure

Where it goes

Buildings framed this way

Long factory building framed with red tapered portal frames and roof purlinsPhoto
World Steel job in Vietnam (Tay Ninh Province): tapered portal frames.
Portal frames standing during erection on a cold sitePhoto
Exported steel in place in Japan: a World Steel job abroad, shown for the building type rather than a US site.
Painted beams with bolted end plates resting on stands below an overhead cranePhoto
Coated beams with end plates welded on, waiting for release in the Vietnam plant.

Questions

Rigid frames, explained plainly

What makes a frame “rigid”?

Its knee and ridge connections are designed to transfer bending moment, so the frame resists sideways loads itself instead of relying on diagonal bracing in that direction.

Do rigid frames need any bracing?

Usually along the length of the building, in the roof and side walls, but not across the frame’s own plane. That keeps end walls and openings free where you need them.

Are the connections welded on site?

No. End plates are welded in our plant and the joints bolt together on site with high-strength bolts.

Who signs off on the frame design?

We prepare the calculations and drawings to your project’s code basis; your Engineer of Record reviews and approves them, and the PE seal and permit stay with your team.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Rigid Frame Systems

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Long factory building framed with red tapered portal frames and roof purlins Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.