How we work · Handover documents

Every document your US steel package needs, handed over in six indexed volumes

From the proposal drawings at quotation to the warranty letter after delivery, World Steel prepares the paperwork a US contractor, its Engineer of Record, its inspector and its customs broker ask for, filed against every piece mark.

The package at a glance

What a US contractor receives from World Steel, document by document

On a US job the steel is judged on paper before it is judged on site. Your Engineer of Record approves the design, your special inspector checks the shop records, your owner keeps the closeout file and your customs broker files the entry. Each of them gets what they need from us, in the order they need it.

  • Prepared in our own IAS AC472-accredited plant in Vietnam, which fabricates 2,500 metric tons (2,750 short tons) of structural steel a month.
  • Filed against every piece mark in PEB Studio as the work is done, so nothing is reconstructed at the end.
  • Written for review: your Engineer of Record approves the drawings and calculations and handles the professional stamp.

For approvalFor recordFor constructionFor customs

From
World Steel, plant in Tay Ninh Province, Vietnam
To
The US contractor, our customer, and its Engineer of Record
Re
Structural steel package, documents issued with this job

Transmittal

  • APDApproval drawings and column reactionsFor approval
  • DCRDesign Calculation ReportFor approval
  • MATMaterial and paint color submittalFor approval
  • SHDShop drawings, WPS and PQRFor record
  • ITPProject Inspection and Test PlanFor approval
  • MDRManufacturing Data RecordFor record
  • ERDErection drawings and bolt listsFor construction
  • CUSCommercial invoice, packing list, originFor customs

Six volumes

The handover package, volume by volume

Each volume belongs to a stage of your project. Open any document for the page that explains how we prepare it, or download a sample.

Fabrication and quality records

The records made while your steel is in our plant, filed against each piece mark and gathered into one data book.

Arrives at: Shop drawings to inspection
Quality inspector taking dimensions on a finished steel member

Who signs what

We prepare the documents. Your team approves, files and builds.

World Steel supplies the steel structure. It does not erect, does not stamp drawings and does not act as your importer. This is how the paperwork splits on a US job.

  • World Steel prepares

    • Designs the steel structure to the US codes in your contract and issues the approval drawings and Design Report
    • Details, fabricates, inspects, coats and packs in its own IAS AC472-accredited plant in Vietnam
    • Issues the shop and erection drawings, the quality records, the packing lists and the commercial documents
  • Your Engineer of Record approves

    • Reviews and approves the approval drawings and the Design Report, and handles the professional stamp
    • Confirms material grades, the coating system and any change to the structure
    • Signs off the project ITP with the US contractor, our customer, and its special inspector
  • The US contractor files and builds

    • Submits the permit set to the building department and answers plan check
    • Acts as importer of record, or names one, whose customs broker files the ISF and the entry
    • Sets the anchor rods, erects the steel with its own crew and keeps the closeout file

Where the records start

Every page in the data book starts on our shop floor

The records are written at the station where the work is done and signed by the inspector who checked it.

  • Live in PEB Studio

    Each record is filed against its piece mark the day it is made, so your team checks progress and paperwork during the job, not after it.

  • One indexed PDF data book

    Bookmarked by volume, piece mark and heat, so a reviewer jumps from a member to its certificate and reports in a few clicks.

  • Kept after the job

    Welding and Dimension Inspection Reports are kept at least three years. Your copy stays with the building records.

  • Open to your inspector

    Your special inspector or third-party agency can witness hold points on site in Vietnam or by video and see the same records.

Questions from US contractors

Questions about the handover documents

What documents does World Steel hand over on a US project?

Six volumes: before award (proposal drawings, sample ITP, credentials, scope of supply), engineering for approval (approval drawings, Design Calculation Report, column base reactions), materials and coating for approval, fabrication and quality records gathered into the Manufacturing Data Record, shipping and customs papers, and erection support documents with the warranty letter.

Who stamps the drawings and the calculations?

Your Engineer of Record. World Steel designs and fabricates the steel structure and prepares the calculations and drawings; the Engineer of Record of the US contractor, our customer, reviews and approves them and handles the professional stamp and the permit.

When do we get the column base reactions?

With the approval drawings and the Design Report, right after the contract and down payment, so your foundation engineer can design footings and anchor rods while the steel is detailed.

Are shop drawings and erection drawings extra?

No. Shop drawings and erection drawings are included on every World Steel project at no extra charge.

Which mill certificates do you supply?

EN 10204 3.1 certificates for each heat of plate, coil and section, filed by heat and traced to the members made from it. Charpy V-notch results can be supplied on request where your specification calls for them.

What welding records do we receive?

Welding procedure specifications, procedure qualification records and welder qualification records to AWS D1.1, D1.3 or D1.8 as your project specifies, sent with the shop drawings, plus weld inspection and NDT reports as each lot is inspected.

Is the ITP fixed?

No. The sample ITP in our download center shows the layout. On your project, the inspection items and the inspection rates are agreed by both parties and signed before fabrication starts.

What does our customs broker receive from you?

The commercial invoice, the packing lists, the certificate of origin, the mill certificates and the melt-and-pour information, together with the bill of lading and the data needed for the Importer Security Filing, shared before the vessel departs.

Is the wood packaging ISPM 15 compliant?

Dunnage and crates are heat-treated wood from certified suppliers, carrying the ISPM 15 mark.

Can we follow the records during fabrication?

Yes. PEB Studio files every record against its piece mark as it is made, and your inspector can witness hold points in our plant or by video.

How are the documents delivered?

As PDF files, indexed by volume, piece mark and heat, plus the IFC model for clash checks. Records can be split by phase, building or shipment to follow your schedule.

What does the warranty cover?

The warranty letter covers the steel supply on the terms and the period written in your contract. Erection, foundations and site work are the US contractor’s scope.

Tell us what your submittal needs

Send your specification and the documents your building official, owner and broker expect. We map them to the six volumes before the contract, from a plant that fabricates 2,500 metric tons of structural steel a month.