Insights series · AIST Technical Report No. 13

Mill buildings under AIST TR-13, the complete series

Thirty in-depth articles that walk US contractors and engineers through AIST Technical Report No. 13, Guide for the Design and Construction of Mill Buildings: crane classes and loads, soil and foundations, loads beyond the crane, frames, runway girders and the shop and service side. Each one paraphrases and cites the section it follows, with metric values first.

30 articles
30 articles1,500 words or more for most
6 parts
6 partsfollowing the report itself
2,500 t / month
2,500 t / monthabout 2,750 US tons of steel
Laser to 100 mm
Laser to 100 mm(4 in) plate cut and holed
Long Sunpro Steel crane bay framed with laced columns on both sides
5,000 tSunpro Steel mill, fabricated in our plant in Vietnam

Written while our plant fabricated the 5,000 t Sunpro Steel mill. AIST TR-13 is published by the Association for Iron & Steel Technology, which does not endorse World Steel; the articles paraphrase and cite it and do not reproduce it.

Every article in the series

The AIST TR-13 mill building library

All 30 articles, in the order of the report, each with the World Steel members and services that part leads to.

Crane classes and loads

Building class, dynamic crane forces, load combinations and the crane data.

ArticleCoversRead
Aerial view of the Sunpro Steel mill buildings in Vietnam, a 5,000 t World Steel projectMill building class A to D: how crane load cycles set the design Building class and crane cycles 4 min
Crane bay steel structure at the Sunpro Steel mill during constructionCrane side thrust, impact and traction: the dynamic loads on a mill runway Impact, side thrust and traction 4 min
Steel columns and crane girders of the Sunpro Steel mill on siteCrane runway load combinations in AIST TR-13: LRFD, ASD and fatigue Runway load combinations 4 min
Overhead crane bay at the Sunpro Steel mill in VietnamThe crane data sheet: what a mill building designer needs before design starts The crane data sheet 3 min
TR-13Sections 1.4–1.5, 3.7, 3.11
Articles4

Site, soil and foundations

Soil investigation, foundations under heavy cranes and the floor slab.

ArticleCoversRead
The finished Sunpro Steel mill building on its site, whose crane columns World Steel fabricatedMill building geotechnical investigation: borings, depths and the report Geotechnical investigation 7 min
Sunpro Steel crane column ends with slotted holes and bracket plates, fabricated by World SteelCrane building foundations: settlement, piles and caissons under heavy cranes Foundations, piles and settlement 7 min
A hall of the World Steel plant laid out with Sunpro Steel crane columns on a concrete floorMill floor slab on grade: subgrade, joints and the steelmaking slag question Slab on grade and slag fill 7 min

Fabricated by World Steel for this part

Base platesAnchor boltsIndustrial floor support structures
TR-13Sections 2, 3.13, 4
Articles3

Loads beyond the crane

Floors, vehicles, earthquake, wind and snow, machines, ducts and harsh areas.

ArticleCoversRead
Heavy built-up members for the Sunpro Steel mill staged in the World Steel plantMill floor live loads: AIST TR-13 Table 3.1 for platforms and operating floors Floor live loads, Table 3.1 7 min
A Sunpro Steel crane column lifted onto a heavy trailer at the World Steel plantMoving loads in mill buildings: rail cars, ladle cars, forklifts and tracked vehicles Rail cars, ladle cars and forklifts 7 min
A heavy laced crane column for the Sunpro Steel mill being welded in the World Steel plantMill building seismic design: crane mass, stored material and the nonbuilding route Seismic design and crane mass 7 min
Sunpro Steel crane legs and roof legs joined by lacing in the World Steel plantMill building wind and snow loads: open sides, drifts, drift limits and frame spread Wind, snow and frame spread 7 min
Sunpro Steel column end plates marked by World Steel fitters before welding and inspectionVibrating equipment supports in mill buildings: fans, screens, crushers and resonance Vibrating equipment supports 7 min
A heavy built-up member for the Sunpro Steel mill on shop supports at World SteelDuct and pipe loads in mill buildings: dust depth, full pipes, utilities and contingency Duct, pipe and utility loads 7 min
A laced crane column for the Sunpro Steel mill being coated in the World Steel paint shopMill building extreme environments: radiant heat, cold, impact and corrosive fumes Heat, impact and corrosion 7 min

Fabricated by World Steel for this part

Seismic steel structuresASCE 7 loadsMachinery support frames
TR-13Section 3
Articles7

Frame, roof and floors

Columns, bracing, trusses, girts, equipment floors and connections.

ArticleCoversRead
Fabricated steel columns on the shop floor at the World Steel plant in VietnamCrane column types: stepped, bracket or independent columns in a mill building Crane column types 4 min
Aerial view of the long crane buildings at the Sunpro Steel millMill building expansion joints and bracing: managing length, heat and crane forces Bracing and expansion joints 3 min
Wrapped built-up members for the Sunpro Steel mill stacked for shipping at World SteelMill roof trusses and frame analysis: base fixity, load sharing and work points Roof trusses and frame analysis 7 min
Finished members for the Sunpro Steel mill grouped for packing in the World Steel plantMill building girts and purlins: hot-rolled, cold-formed or joists, and the extra loads Girts and purlins 7 min
Heavy members for the Sunpro Steel mill packed and stacked for dispatch at World SteelEquipment floor framing in mill buildings: supplier limits, deflection and vibration Equipment floor framing 7 min
Sunpro Steel built-up members with bolted end plates and splice holes, packed at World SteelMill building connections: slip-critical bolts, weld spacing and minimum thickness Connections and minimum thickness 7 min

Fabricated by World Steel for this part

Crane-supporting columnsSteel trussesEquipment platforms
TR-13Sections 5.2–5.14
Articles6

Runway girders and rails

Fatigue details, stiffness, backup bracing, end stops and the rail system.

ArticleCoversRead
Submerged arc welding of a built-up girder at the World Steel plant in VietnamCrane girder fatigue: the weld details AIST TR-13 asks for Fatigue-rated weld details 4 min
Crane runway girders and columns of the Sunpro Steel mill buildingCrane girder deflection and frame drift limits for mill buildings Deflection and drift limits 3 min
Aerial view of crane bays and runway structure at the Sunpro Steel millCrane girder backup bracing and box girders for long, heavy runways Backup bracing and box girders 4 min
Interior crane bay of the Sunpro Steel mill with runway girders along the columnsCrane runway end stops and bumper forces: designing for the full-speed hit End stops and bumpers 3 min
Crane runway level at the Sunpro Steel mill, with girders ready for the railCrane rail joints, clips and pads: choosing the rail system for a mill runway Rail joints, clips and pads 3 min

Fabricated by World Steel for this part

Crane runway girdersBox girdersWelded plate girders
TR-13Sections 3.7.3, 5.8, 5.15
Articles5

Shop, testing and service

Weld testing, tolerances, maintenance access, inspection and upgrades.

ArticleCoversRead
Sunpro Steel mill crane buildings, whose girder welds were tested in the World Steel plantCrane girder weld testing: which welds get UT, RT, MT or PT under AIST TR-13 Weld testing: UT, RT, MT, PT 3 min
Steel frame with crane runway brackets, showing column seats and girder endsCrane column and girder end tolerances: shop limits that keep the rail straight Column and girder tolerances 3 min
Laced crane columns for the Sunpro Steel mill lined up on shop supports at World SteelCrane runway maintenance access: walkways, repair platforms and horizontal lifelines Maintenance access and lifelines 7 min
Crane runway girders and columns inside the Sunpro Steel millCrane runway inspection: setting up a program for an operating mill building Runway inspection program 4 min
Heavy crane bay structure at the Sunpro Steel mill, designed for cranes up to 150 tCrane runway upgrade: reusing an existing mill building for a heavier crane Upgrading an existing mill 3 min

Fabricated by World Steel for this part

WPS and PQR recordsMaintenance walkwaysAccredited testing labs
TR-13Sections 1.6, 5.16–5.17, App. C
Articles5

Mill-scale capacity

A steel mill is a large package. We have fabricated one.

Sunpro Steel took about 5,000 t of laced crane columns, runway girders and roof steel through our plant. The line fabricates about 2,500 t (2,750 US tons) of structural steel a month, sized for the heavy industrial packages large US contractors bid.

Questions about the series

AIST TR-13 series Q&A

What is AIST Technical Report No. 13?

AIST TR-13, Guide for the Design and Construction of Mill Buildings, is the Association for Iron & Steel Technology’s guide for steel mill and other crane-serviced heavy industrial buildings. It sets building classes by crane service and covers crane loads, foundations, frames, runway girders, fatigue, deflection and drift, and inspection.

Who is this series for?

US general contractors, owners and Engineers of Record working on mills, melt shops, rolling mills and other heavy crane buildings, who want to know what TR-13 asks of the steel and how a fabricator in Vietnam delivers it.

Do the articles replace the report?

No. Each article paraphrases and cites the TR-13 section it follows and adds how the steel is detailed, fabricated and checked in our plant. Your Engineer of Record designs to the full report and the codes your jurisdiction adopted.

Can World Steel fabricate crane runway girders and crane columns for a US mill?

Yes. Our plant fabricated about 5,000 t of laced crane columns, runway girders and roof steel for the Sunpro Steel mill, with AWS D1.1 welding, NDT at accredited labs and records per member. Erection and site work are the US contractor’s scope.

Do you supply the overhead cranes too?

On request, World Steel supplies overhead cranes with the building, so the crane data and the runway design come from one package.

Who approves the design?

The US contractor, our customer, and their Engineer of Record. We deliver calculations and drawings ready for their review and approval; the permit is theirs.

Bidding a mill or heavy crane building?

Send the crane data, the bay layout or the bid documents. Our engineers confirm the runway girders, crane columns and frame steel World Steel would fabricate, from a plant that turns out 2,500 metric tons of structural steel a month.