How we work
Four gates before anything ships
- Listed design firstYour designer names the tested design number for each rated wall or roof.
- Parts matched line by lineEvery component in the listing is checked against what we can supply.
- Gaps flagged earlyAnything we cannot match is raised before the quote, not on site.
- Approval stays with your teamThe Engineer of Record and the authority having jurisdiction approve the assembly.
Why it pays
Straight answers on fire
No paper ratings
We never claim what is not tested.
Matched to the listing
Each part checked against the design.
Problems raised early
Before the quote, not at inspection.
Supplied with the steel
Framing and materials together.
Scope
What we supply, what we need
- What we supply
- Steel framing, panels and selected materials that match the named listed design
- What we need
- The listed design number and the rating required, from your designer
- Rating
- Only as given by the listed design; never claimed by World Steel
- Substitutions
- None without your designer’s approval
- Documents
- Material data for submittals, per project
- Related
- Structural steel fire protection is a separate scope
How it runs
From listing to shipment
- Listing receivedDesign numbers from your designer.
- Parts checkedWhat matches, what does not.
- Quote with notesClear on what is in scope.
- Shipped with dataFor your submittals.
Photo
PhotoWhere it comes up
Buildings with rated walls or floors
Questions
Fire-rated assembly questions
Can World Steel give my wall a two-hour rating?
No. A rating comes from a tested, listed design built exactly as listed. We supply materials that match the design your Engineer of Record names; the rating is theirs to specify and the authority’s to accept.
Do you have your own listed assemblies?
No listed assembly of our own has been identified. We work from listed designs your team selects.
What if a part in the listing is not something you supply?
We flag it in the quote so your contractor can buy it locally. We never swap in a different part without your designer’s approval.
Is this the same as fireproofing the steel frame?
No. Rated walls and roofs are one scope; protecting the steel members with coatings or fireproofing is another, covered on our steel fire protection pages.
More insulation and performance: Vapor Control Layers · Thermal Breaks · Acoustic Insulation · Condensation Control Systems
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Selected Fire-Rated Assemblies
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions