Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Mezzanines & floor systems · Composite floor steel

Steel and concrete, working as one beam

In a composite floor, the concrete slab on metal deck is tied to the steel beam below with shear studs, so the two act as one deeper, stiffer section. That means lighter beams for the same span, or longer spans for the same weight. We design the beams to AISC 360 for the composite action, fabricate them in our plant, and coordinate stud layouts on the drawings.

Cross-section of a composite floor: concrete slab on ribbed metal deck, shear studs into the slab, steel beam below; compression at the top, tension at the bottom Concrete slabMetal deckStudsSteel beamCompressionTension
IllustrationStuds are welded on site through the deck.

The section

Four layers, one beam

  1. Concrete slabTakes compression at the top
  2. Metal deckPermanent formwork, ribs across the beam
  3. Shear studsTie slab to beam; field-welded through the deck
  4. Steel beamTakes tension at the bottom

Why it pays

Less steel, stiffer floors

  • Lighter beams

    The slab shares the work.

  • Longer spans

    Fewer columns in the floor.

  • Stiffer floors

    Less bounce under foot.

  • Coordinated drawings

    Stud and deck layout shown.

  1. Composite designBeam, deck and slab together.
  2. Shop drawingsCamber, studs, unpainted zones.
  3. FabricatedCut, cambered, coated.
  4. Shipped by floorMarked by level and grid.

Specification

Composite floor steel at a glance

Members
Hot-rolled or built-up floor beams and girders
Design
Composite action designed to AISC 360; loads from ASCE 7-22
Shear connection
Stud size and spacing per design; studs welded on site through the deck
Camber
Shop camber where the design calls for it
Top flange
Left unpainted where studs are welded
Approval
Drawings reviewed by the US contractor and their Engineer of Record

Where it goes

Buildings with concrete floors

Primed column with its bolted end plate set on painting standsPhoto
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Long warehouse frame running beside a roadPhoto
Exported steel in place in Philippines: a World Steel job abroad, shown for the building type rather than a US site.

Questions

Composite floor questions

Who welds the shear studs?

The studs are welded on site through the metal deck by your US contractor’s crew, after the deck is laid. We leave the top flanges unpainted where studs go and show the layout on the drawings.

Is a composite floor always cheaper?

For most office and commercial floors it saves steel weight. For short spans or light loads a non-composite beam can be simpler. Our engineers compare both.

Do you supply the metal deck too?

Decking is in our panels range and can ship with the beams. Deck design is to SDI standards.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Composite Floor Support Steel

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Six-story steel frame seen from the front, floor deck in place Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.