As runway spans and crane capacities grow, a single crane girder starts to have a problem it cannot solve alone: wheel loads sit on the rail above the web, side thrust pushes at the rail head, and the girder twists. AIST Technical Report No. 13 (2021), Sections 5.8.2.1 and 5.8.2.2, offers two answers, the backup bracing system and the box girder.
Why long girders twist
TR-13 lists the sources of torsion on a crane girder: lateral wheel loads applied at the rail head above the top flange, and vertical wheel loads when the rail is not exactly over the web, which is always true within fabrication and erection tolerance. On a long girder, sweep, lateral deflection from side thrust and vertical load combine into real distortion. Torsion also cuts lateral-torsional buckling and sidesway web buckling strength.
When to add backup bracing
The report recommends a backup system at the top flange and near the bottom flange for girders spanning more than about 15 m (50 ft), or other rational ways to add lateral and torsional stiffness. The commentary notes that editions up to 2003 asked for bottom-flange bracing from about 11 to 12 m (36 to 40 ft) depending on class; checking AISC 360 limit states now covers the shorter spans, so the threshold moved to 15 m for all classes.
Backup systems are also common where a walkway is needed at runway level.
How the system works
The crane girder sits beside a backup girder or the top chord of a backup truss. A continuous auxiliary plate (often the walkway) or diagonal lacing connects their top flanges:
- Each girder carries its own vertical loads.
- With the top flange tied to the plate, the crane girder's compression flange is continuously braced, so lateral-torsional buckling no longer limits its strong-axis bending. Strength and stiffness of that bracing follow AISC 360 Appendix 6.
- Side thrust is resisted by a horizontal girder made of the two top flanges, the plate and an effective depth of each web, given by an equation in TR-13 based on web thickness and yield strength.
- With diagonal lacing instead of a plate, the system acts as a horizontal truss, and the lacing connections are designed for fatigue and for the vertical movement between the two girders.
- The bottom flange lacing is designed for at least 25% of the top system force.
Bolts between the crane girder and the horizontal plate are spaced for full shear transfer, or tighter where AISC limits for compression members govern. Welded plate connections are continuous top and bottom.
The ends: release rotation
At girder ends, TR-13 recommends stopping the auxiliary plate short and using a discrete tieback to the column. Both the backup system and the tieback are detailed to minimize restraint of girder end rotation, because a girder end that is held stiffly cracks its tieback under each pass. The commentary to the deflection rules makes the same point (see crane girder deflection and drift limits).
Vertical cross frames
Vertical cross frames between crane and backup girders are not used unless the frame and the stiffening truss are designed for the forces, including cyclic loading. Every weld in a backup system is checked for fatigue, and the drawings must say which welds take cyclic acceptance criteria (see crane girder weld testing).
Box girders
A rectangular box girder is the other answer. Its closed section is stiff in torsion, so the whole section can resist vertical and lateral loads together. TR-13 still asks for:
- design for torsion, including distortion of the cross-section, with the vertical and lateral loads;
- internal diaphragms or stiffeners to carry wheel loads to the side walls when the rail sits between the webs, and to control distortion;
- fatigue checks at every element and internal connection;
- end connections that allow the girder to rotate.
The report adds that the designer should work with the fabricator early on assembly sequence and weld details, since the inside of a box is hard to reach.
How World Steel builds them
We fabricate crane runway girders, backup girders and trusses, walkway plates and box girders in our own plant in Vietnam, with welding sequences planned for closed sections. The long runways at the Sunpro Steel mill, designed for cranes up to 150 t, are a good example. See our crane design standards page.
Solutions and the Sunpro Steel project
The rules in this article come together in our crane building system: runway girders, stepped columns, bracing and, on request, the overhead cranes, supplied as one package. For whole facilities, see our solutions for heavy industrial plants and manufacturing plants with crane bays. The reference job is the Sunpro Steel mill project: about 5,000 t of steel and crane bays for cranes up to 150 t, our largest crane building to date.
Source and limits
This article paraphrases AIST Technical Report No. 13 (2021), Sections 5.8.1, 5.8.2, 5.14 and the commentary. The girder system on each job is set by the design and approved by the Engineer of Record.
Quick answers
When does a crane girder need backup bracing?
AIST TR-13 recommends a backup system at the top flange and near the bottom flange for girders spanning more than about 15 m (50 ft), or other rational means to add lateral and torsional stiffness.
What is a backup girder?
A second, lighter girder or truss beside the crane girder, joined to its top flange by a horizontal plate or lacing. Together they form a horizontal girder that resists side thrust and often doubles as a walkway.
Are box girders a good crane girder?
They can be: the closed section resists torsion well. TR-13 asks for a full torsion and distortion check, fatigue checks at every internal weld and end connections that let the girder rotate.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors
- Solutions by stateState-by-state steel solutions


