What is the difference between a WPS and a PQR?
+
The WPS is the instruction the welder follows on production work. The PQR is the record of the test weld that proved the procedure, with the actual settings used and the test results. A prequalified WPS needs no PQR; a WPS qualified by test must be supported by one.
Is a PQR required for every WPS under AWS D1.1?
+
No. A WPS that stays inside every prequalified limit of AWS D1.1, from process and base metal to joint detail, filler metal, preheat and settings, can be used without a procedure test. Step outside any one limit and the WPS needs a supporting PQR.
What does WPQ mean on a submittal?
+
Welder Performance Qualification: the record that a named welder passed the test for a process, position and thickness range. Welding operators on automatic equipment and tack welders have their own qualification records.
Can one PQR support several WPSs?
+
Yes. A single PQR can support more than one WPS, as long as each WPS stays inside the ranges the PQR qualifies. Equally, one WPS can rest on more than one PQR, for example to cover a wider thickness range.
How long is a WPS or a PQR valid?
+
A qualified procedure does not expire. It stays valid as long as the essential variables written in it are respected. If a variable changes beyond its range, a new PQR is needed.
Will you accept a WPS qualified under ASME Section IX?
+
An ASME Section IX qualification is not automatically valid under AWS D1.1. Your Engineer decides whether earlier qualifications can be accepted; otherwise we qualify the procedure to AWS D1.1 before production.
Who witnesses a PQR test?
+
Our QC team runs the test weld and records the actual values, and the coupons go to a testing laboratory for the mechanical tests. Your inspector or agency can witness the welding and the testing in Vietnam or live by video, if you set it as a witness point in the ITP.
Do you need Charpy testing in the PQR?
+
Only when your contract documents call for notch toughness, as is common for demand-critical seismic welds and some heavy or low-temperature work. Then the PQR includes CVN tests, and heat input becomes a supplementary essential variable.
Can a welder qualified with another employer weld on our job?
+
AWS D1.1 lets the Engineer accept properly documented earlier qualifications. In practice every welder on your members is qualified and tracked by World Steel, so their records come with our submittal.
What is a welding operator, and why are they qualified separately?
+
A welding operator runs mechanized or automatic equipment, such as our submerged arc beam lines, rather than holding the torch. Their skill is in setting up and running the machine, so they are tested on that equipment under a qualified WPS.
Does AWS D1.8 change the WPS for seismic frames?
+
Yes, for the demand-critical welds. Filler metals must meet notch-toughness and diffusible hydrogen limits, procedures are run inside a tested heat-input envelope, and welders get the supplement’s extra training and tests where required.
Do you send the WPS and PQR before fabrication starts?
+
Yes. The welding submittal goes with the shop drawings for your Engineer of Record’s review: the WPS list matched to the joints, each WPS, the supporting PQRs, welder records and filler metal certificates. Fabrication of those joints follows approval.
Are the welding records part of the final data book?
+
Yes. The WPS, PQR and welder records sit in the welding section of the data book with the weld and NDT reports, filed by piece mark in PEB Studio and exported to PDF at handover.
Does AWS certify World Steel as a company?
+
AWS D1.1 does not certify fabricators as companies. It requires qualified procedures, qualified welding personnel and inspection, which we provide on each job, together with EN ISO 3834-2 certification of our welding quality system by Bureau Veritas and IAS AC472 accreditation of our plant.