Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Crane runway & industrial supports · Crane columns

Columns that carry the roof and the crane

A crane building asks its columns to do two jobs at two heights: hold up the roof and carry the crane runway. They also have to stay stiff, because a column that sways moves the rail with it. We design stepped columns and columns with crane brackets as part of the main frame, check drift and stiffness so the runway stays in line, and ship them with base plate and anchor rod layouts.

Stepped crane column: a slim upper shaft to the roof, a wider lower leg with a step carrying the runway girder, and a base plate with anchor rods Roof shaft Crane step Base
IllustrationOne column, two load levels.

Top to bottom

What each level of the column does

  1. Roof levelThe upper shaft carries the roof frame and wind loads.
  2. Crane levelA bracket or a step carries the runway girder.
  3. BaseBase plates and anchor rods sized for crane and frame loads.

Why it pays

Stiff columns, straight rails

  • Runway stays in line

    Drift and stiffness checked.

  • Two load paths, one column

    Roof and crane together.

  • Foundations ready

    Anchor layouts sent early.

  • Accredited welding

    IAS AC472 since 2019.

Types
Stepped columns, laced columns and columns with crane brackets
Design
Designed to AISC 360 and AISC Design Guide 7, with drift and stiffness checks
Welding
AWS D1.1, in our IAS AC472 accredited plant
Crane data
From the crane supplier, per CMAA 70 or 74
Base
Base plate and anchor rod layouts for your foundation engineer
Marking
Piece marks and grid lines for erection
Tall lattice columns of a crane-served industrial building during erectionPhoto
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.
Factory frame by World Steel under erection, photographed by dronePhoto
Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.

How it works

Foundations first, columns right behind

  1. Crane and roof dataLoads and heights.
  2. Columns designedWith the frame and runway.
  3. Anchor layouts issuedTo your foundation engineer.
  4. Columns shippedMarked by grid line.

Questions

Crane column questions

Stepped column or bracket?

Light cranes usually ride on brackets off a uniform column. Heavier cranes often need a stepped or laced column, with the runway on its own leg. We pick the form in design.

When do you send the anchor rod layout?

Early, ahead of the steel, so your contractor can pour footings while the columns are being fabricated.

Who pours the footings?

Your contractor, to your foundation engineer's design. We provide the column reactions and anchor rod layouts.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Crane Supporting Columns

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Tall lattice columns of a crane-served industrial building during erection Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.