Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Wrapped built-up members for the Sunpro Steel mill stacked for shipping at World Steel

Pre-engineered buildings

Mill roof trusses and frame analysis: base fixity, load sharing and work points

Whether a mill roof truss is pinned or fixed to its columns changes the whole frame: column sizes, foundations, drift and the crane rail. AIST TR-13 asks the designer to decide deliberately and analyze accordingly. Here is how.

· updated November 23, 2026 · 7 min read · World Steel USA engineering team

A mill building frame looks simple from the floor: tall columns, a crane girder on each side and a roof truss or girder spanning across. But how those parts are connected decides how the frame behaves, and that drives the size of every column, the moment in every foundation and the drift at the crane rail. AIST Technical Report No. 13 (2021) sets out the approach in Sections 5.1 to 5.4, with commentary that explains several changes from earlier editions. This article walks through them.

AISC first, TR-13 as the supplement

Section 5.1 sets the basis: design and workmanship follow the AISC Specification for Structural Steel Buildings (AISC 360) and the AISC Code of Standard Practice, except where TR-13 adds to them. The report works with either ASD or LRFD, with load combinations in its Chapter 3, and points designers to AISC, AIST and Structural Stability Research Council publications for more guidance and examples.

The commentary to Chapter 5 notes an important change. Editions up to 2003 included prescriptive design rules for crane girders and columns. The 2021 edition removed them and sends the user to AISC 360, because the AISC specification now covers the relevant limit states properly. Chapter 5 of TR-13 now tells the designer which limit states must be checked, rather than how to calculate them.

The parts of a mill frame

Section 5.2 lists the components of a typical mill building:

  • primary columns;
  • roof primary framing (trusses or girders);
  • roof secondary framing (purlins);
  • crane girders;
  • longitudinal braced frames;
  • roof diaphragms or horizontal bracing;
  • sometimes floor diaphragms or horizontal bracing.

The lateral system usually combines rigid frames or cantilever columns across the building with vertical braced frames along it. Roof and floor diaphragms or horizontal bracing distribute lateral loads to those elements. Frames are laid out on a uniform module, chosen from the process layout and an economic study.

Planar frames or a space frame

The biggest decision in Section 5.2 is whether to tie the transverse frames together with horizontal bracing in the plane of the roof or the truss bottom chord. That bracing spreads transverse loads, such as crane side thrust, over several frames and limits the relative movement between neighbors.

The commentary explains how the guidance has changed. Early editions seemed to require a longitudinal horizontal bracing system that turned the frames into a space frame. The current edition says a space frame can be useful but is not required. The trade-off it describes:

  • With horizontal bracing and load sharing: lighter columns and smaller foundations, because a crane side thrust at one frame is shared with its neighbors.
  • Without it: less bracing steel, simpler fabrication and faster site work, but each frame must carry its own crane forces.

TR-13 leaves the choice to the engineer and the owner, based on benefits, costs including fabrication and site work, and schedule. Section 5.5 adds that if load sharing is used, the bracing must be continuous between expansion joints and designed from a three-dimensional model that accounts for the stiffness of the bracing and the frames. Our article on bracing and expansion joints covers that system.

Fixity: the two connections that decide behavior

Section 5.3 says the behavior of a planar frame depends on two things: how fixed the column bases are, and how fixed the truss-to-column connection is. The usual combinations are:

Column base Truss to column Frame behavior
Fixed Pinned Cantilever columns; the truss is a simply supported strut-beam
Fixed Fixed Rigid portal frame; the stiffest option
Pinned Fixed Rigid frame with pinned bases; more drift, lighter foundations
Pinned Pinned Unstable on its own; needs bracing in its plane

TR-13 notes that in typical mill construction the bases are fixed or partly fixed, and that the degree of fixity depends on the anchorage details, the foundation and the soil. That fixity must be accounted for in both the frame design and the foundation design. A frame modeled with fully fixed bases on a foundation that rotates under load will drift more than calculated, with consequences for the crane runway.

If horizontal bracing is used, Section 5.3 asks that it be designed for forces consistent with the intended frame behavior, with due regard to the relative stiffness of each part of the system.

Sharing side thrust by stiffness

Section 5.3 asks that the total crane side thrust be distributed between the runway support columns on the basis of an overall analysis that accounts for relative stiffness. The commentary explains why the common shortcut, splitting it equally between the two sides of the aisle, can be wrong:

  • in multiple-aisle buildings, column towers on each side can have different widths or framing;
  • one side of an aisle may have a long-span girder over several bays, with very different stiffness from the columns on the other side;
  • an outer wall column and an interior column are rarely equally stiff.

The designer must estimate the stiffness to distribute the crane loads, and then check those assumptions in the structural model. The stiffer side attracts more of the thrust.

Roof trusses and girders

Section 5.4 deals with the roof members themselves:

  • their role must be included in the frame analysis;
  • their design and connections must match the intended connectivity to the columns, fixed or pinned;
  • where fully fixed cantilever columns are used, the truss may be a simply supported member that carries the roof loads and any axial strut forces from the frame analysis;
  • truss chords under bending are designed for combined bending and axial force;
  • at each connection, member axes should meet at a common work point unless clearances prevent it, and where they do not, the eccentricity must be included in the design.

The work point rule matters in fabrication as much as in design. A truss with chords, verticals and diagonals meeting at one point carries its forces axially. Shifting a diagonal to clear a duct or a crane conductor introduces bending into the chord and the gusset, which must then be designed for it. On heavy mill trusses, where diagonals can carry hundreds of kilonewtons, that bending is not small.

The cantilever column arrangement is popular in mills because the truss becomes simple: it carries roof loads and a strut force, and its end connections are shear connections. The columns, fixed at their bases, carry all the lateral load and moment. That puts the demand into the crane supporting columns and their foundations, which is why base fixity matters so much.

Truss or plate girder?

TR-13 uses the phrase "roof trusses or girders" throughout, leaving the choice open. Both work, and the decision is usually practical:

  • Trusses are light for long spans and let ducts, pipes and cable trays pass through the depth of the roof structure. They have many connections to fabricate and inspect, and many surfaces to paint, which matters in corrosive areas.
  • Plate girders or rolled beams are quicker to fabricate and simpler to coat and inspect, but they are heavier on long spans and take up depth that services then have to run below.

Mill roofs over wide crane aisles, often 25 to 35 m, usually favor trusses. Narrower lean-to bays and process areas with few services may favor solid-web members. Where a truss is used as a bracing chord or tie, as in a load-sharing system, its bottom chord also carries the horizontal bracing forces, and Section 5.5 suggests placing the horizontal bracing at the bottom chord to simplify the detailing.

Heavy roof trusses for mill buildings are usually shipped in pieces and spliced on site. The splice locations, bolt type and sequence are part of the design, and placing splices near panel points where chord forces are low keeps the bolted connections small.

Drift and gauge follow from the analysis

The frame analysis also feeds TR-13's serviceability checks. Section 5.3 limits drift at the top of the crane girders to height/400 or about 50 mm (2 in), whichever is less, under crane lateral forces and under a 10-year wind, and limits rail gauge change under gravity to between +25 mm and -12 mm (+1 in and -1/2 in). Our article on deflection and drift limits covers the girder side, and wind and snow loads covers the wind and snow inputs.

Stability and notional loads

Tall mill columns, especially stepped crane columns, are stability-sensitive. AISC 360's direct analysis method, with notional loads and reduced stiffness, is the usual approach, and TR-13 lists a paper on designing mill building columns with notional loads among its references. Section 5.5 also asks that stability bracing for columns, beams, girders and truss chords meet AISC 360 Appendix 6. Our article on crane column types covers the columns in detail.

How World Steel applies it

World Steel designs and fabricates mill frames, steel trusses, long-span structures, crane columns and roof bracing for US projects. On a mill building, our engineers:

  • compare cantilever column and rigid frame options, and planar frames against load sharing with horizontal bracing, with the owner and the Engineer of Record;
  • agree base fixity with the foundation designer and model it consistently in the steel and foundation designs;
  • distribute crane side thrust by stiffness from a full model, and check drift and rail gauge to TR-13;
  • detail trusses to common work points, and design for eccentricity where clearances force it.

Our structural analysis page explains how we model and document these checks, to AISC 360. The US Engineer of Record reviews and seals the design. Fabrication is in our plant in Vietnam, accredited under IAS AC472 and audited twice a year. Site work is the US contractor's scope.

Solutions and the Sunpro Steel project

Our heavy industrial plants solution shows how World Steel handles a full mill or heavy plant, and the crane building system page shows the runway package. For a factory with bridge cranes, start from manufacturing plants with crane bays. The Sunpro Steel mill project, about 5,000 t with 150 t cranes and laced crane columns, is where these TR-13 points were applied at full scale.

Source and limits

This article paraphrases AIST Technical Report No. 13 (2021), Sections 5.1 to 5.5 and the commentary to Sections 5.0 and 5.3. The fixity table is a simplified summary. The framing system and analysis are set by the Engineer of Record on each project.

Quick answers

Does AIST TR-13 require roof bracing that ties all frames together?

No. The 2021 edition makes horizontal bracing that shares load between frames an option. It can give lighter columns and smaller foundations, but adds bracing steel and fabrication and site time, so the owner and designer decide.

How is crane side thrust shared between the two runway sides?

By relative stiffness, from an analysis of the whole system. AIST TR-13 notes that the two sides of an aisle often have different stiffness, so an equal split is not always correct.

What does AIST TR-13 say about truss work points?

Member axes should meet at a common work point at each connection unless clearances prevent it. Where they do not, the eccentricity must be included in the member design.

Keep building your steel plan

Go further on USPEB.com

Keep going in the series

AIST TR-13 mill building series

Thirty in-depth articles on AIST Technical Report No. 13: crane classes and loads, soil and foundations, floors and process loads, frames, runway girders and the shop and service side, each paraphrasing the section it follows, with metric values first.

30 articles · 6 parts

Crane classes and loadsSections 1.4–1.5, 3.7, 3.11

Building class, dynamic crane forces, load combinations and the crane data.

Site, soil and foundationsSections 2, 3.13, 4

Soil investigation, foundations under heavy cranes and the floor slab.

Frame, roof and floorsSections 5.2–5.14

Columns, bracing, trusses, girts, equipment floors and connections.

Runway girders and railsSections 3.7.3, 5.8, 5.15

Fatigue details, stiffness, backup bracing, end stops and the rail system.

Shop, testing and serviceSections 1.6, 5.16–5.17, App. C

Weld testing, tolerances, maintenance access, inspection and upgrades.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.